My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2000 AGN AUG 01 I09_Professional Services Agreement_
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2000
>
2000 August 01 Agenda Packet
>
2000 AGN AUG 01 I09_Professional Services Agreement_
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2014 1:55:05 PM
Creation date
2/20/2014 10:20:59 AM
Metadata
Fields
Template:
General Documents
Created By
admin
DocType
Agendas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Meeting <br />I, ZUUU <br />SUBJECT: REQUEST FOR APPROVAL OF PROFESSIONAL SERVICES AGREEMENT <br />FOR DESIGN OF A POWER GENERATION FACILITY WITH STEWART & <br />STEVENSON, INC., OF SANTA ANA, CALIFORNIA, IN THE AMOUNT OF <br />$150,000 <br />engine plant to protect from and sell into the highly volatile regulation and peaking <br />markets, with operations under the control of the City of Colton. Colton's interest <br />would be about 98% (5MW) of a total estimated plant cost of $5 million. <br />The Electric Utility is proceeding with feasibility studies on Type 1, and hereby is proposing to <br />proceed with the detailed design of Type 2. Both facilities are proposed to be located in the City <br />of Colton for their local economic and electrical benefits. Both are natural gas fueled for air <br />quality. <br />ALTERNATIVES <br />The Electric Utility, based on existing market conditions that will become worse before they get <br />better, believes that time is of the essence with respect to the development of both types of <br />physical hedges. The Utility is already employing financial hedges and could resort to them <br />entirely, albeit with their inherent disadvantages. The concern with the sole use of financial <br />hedges is the risk of significant cash balance losses should a peak month have a long period of <br />cooler than expected weather. <br />Conservation has its place, and the Utility has awarded contracts for energy efficiency. <br />Progress is slow in large measure due to customer reticence to make their necessary share of <br />the investment. Customers also hesitate to curtail operations of their manufacturing or stop <br />cooling their homes. <br />FINANCIAL IMPACT <br />Funding for these services is available in the Electric Utility Capital line item 520-8000-8014- <br />3890-0107-000. Contract costs are capped at $50,000 for the contract period often months. <br />ENVIRONMENTAL IMPACT: None. <br />RECOMMENDATION <br />Staff recommends that the City Council approve the Professional Services Agreement between <br />the City of Colton and Stewart and Stevenson, Inc., of Santa Ana, California, in the amount of <br />$150,000 for the design of a Five -Megawatt Electric Generation Facility. <br />Report prepared by Timothy C. Trewyn, P.E., Assistant Electric Utility Director <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.