Laserfiche WebLink
1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />improvements, where the appointed registered engineer or architect <br />finds it adequate without a soil report." <br />G. Section 2314.5 is inserted with the following as its subsection <br />consisting of three paragraphs: <br />"2314.5.6 Structural Integrity. Shear walls shall be properly connected <br />to their supports and carried up to roofs, through floors and down to <br />foundations. Structural discontinuity shall be justified by analysis and <br />details for shear transfer. Shear walls shall not terminate at unblocked <br />diaphragms or at diaphragms with unsupported panel joints unless <br />justified. <br />Where a shear wall terminates at a diaphragm and is parallel to the <br />diaphragm framing members, a satisfactory shear collector (or framing <br />member) shall be aligned under the shear wall. Tranverse full -depth <br />solid blocking shall be provided at not more than four feet on center <br />with a minimum of two lines of blocking at wall edges. <br />Where a shear wall terminates at a diaphragm and is perpendicular to <br />the diaphragm framing members, three lines of continuous full -depth <br />solid blocking shall be provided between the framing members at not <br />more than 24 inches on center under and preferably symmetrical about <br />the longitudinal axis of the shear wall." <br />H. Soils Reports — Amendment 3309.5/3309.6: <br />Geology soils reports shall be recognized for a six month period. After the <br />six month period expires and without activity an upgrade shall occur to the <br />report prior to construction. Should a total time frame of twelve months <br />occur without any activity the project may be subject to a complete new <br />submittal should site conditions merit such action. Adequate and sufficient <br />geological and geotechnical soils studies shall be conducted for its <br />intended use. This determination is to be made by the Building Official or <br />his/her designee. This requirement shall be separate from any planning <br />n <br />