Laserfiche WebLink
EXHIBIT "B" <br />SCHEDULE OF WATER FEES <br />Development Fees: <br />1. Plan Check and Inspection - as a percentage of improvement cost: <br />Cost of Improvement <br />A. Plan Check Fee $1.00 and over 4.0% <br />B. Inspection Fee $1.00 to $25,000 4.5% <br />$25,001 to $100,000 4.0% <br />$100,001 and over 3.5% <br />2. Additional engineering and construction costs for <br />water facilities not being installed prior to underground <br />electric, telephone, gas, TV, etc.: <br />Per water service connection $60.00 <br />or per foot, 60 foot minimum $1.00 <br />(whichever is greater) <br />3. Connection Charges: <br />Full Service Connection (Meter Size) <br />A. 1" $1,250.00 <br />B. 1 1 /2" $1,570.00 <br />C. 2" $1,780.00 <br />D. Any meter larger than 2" is installed by the contractor, <br />plan checked, permitted and inspected by the City. <br />Meter and Box Only (Meter Size) <br />A. 3/4" $100.00 <br />B. 1" $170.00 <br />C. 1 1/2" $325.00 <br />D. 2" $440.00 <br />E. Any meter larger than 2" is installed by the contractor, <br />plan checked, permitted and inspected by the City. <br />NOTE: THESE FEES ARE NOT BEING INCREASED, THEY <br />ARE BEING INCLUDED AS A PART OF THE ORDINANCE <br />TO CREATE A COMPREHENSIVE LISTING OF FEES <br />3 <br />