Laserfiche WebLink
1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />less than 5 tons capacity. <br />D. After the above mentioned operation on all road- <br />ways, or portions thereof, having an improved surface other than <br />dirt roadways, or parkways, the top surface of the backfill shall <br />be covered with not less than 1" or more than 2" of pre -mixed bitt <br />minous materials, and shall conform to the level of the adjoining <br />street surface, and shall be compacted so that it is hard and <br />smooth enough to permit traffic to pass over at the legal rate of <br />of speed. <br />E. Thirty days after the temporary pavement has been <br />placed the company doing the excavating work shall place the <br />permanent pavement. <br />F. Minimum width of excavation shall be determined <br />as follows: A) main lines one foot. B) laterals from mainline <br />six inches. <br />Section V Resolution No. 1761 is hereby repealed. <br />PASSED, APPROVED and ADOPTED this 20th day of January 198' <br />ATTEST: <br />HELEN A. RAMOS, CMC <br />City Clerk <br />