Laserfiche WebLink
1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />RESOLUTION NO. R-77-91 <br />A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF <br />COLTON, MAKING CERTAIN FINDINGS, ADOPTING CERTAIN <br />MITIGATION MEASURES, CONCLUDING BENEFITS OUTWEIGH <br />UNAVOIDABLE ADVERSE ENVIRONMENTAL IMPACTS AND <br />GRANTING PROJECT APPROVAL, ALL WITH RESPECT TO <br />MEAD-ADELANTO PROJECT <br />WHEREAS, this Governing Body recognizes that studies were undertaken with <br />respect to the environmental effect of the Mead/McCullough-Victorville/ <br />Adelanto Transmission Project, also known as the Mead-Adelanto Project (the <br />"Project"). These studies include the joint Draft Environmental Report (the <br />"Draft ER") and Final Environmental Report (the "Final ER") prepared by the <br />United States Department of Interior, Bureau of Land Management and the Los <br />Angeles Department of Water and Power ("Los Angeles"); and <br />WHEREAS, Los Angeles certified the Final Environmental Report in December <br />1986, approved the Project and filed a Notice of Determination with respect <br />thereto; and <br />WHEREAS, Los Angeles prepared an addendum to the Final ER (the <br />"Addendum") to reflect minor technical changes to the Project and changes in <br />circumstances under which the Project is proposed to be undertaken, and Los <br />Angeles adopted the Addendum in June 1991; and <br />WHEREAS, the Draft ER and the Final ER, as updated by the Addendum, have <br />been submitted to this Governing Body and this Governing Body has considered <br />the information contained therein. <br />NOW, THEREFORE, this Governing Body hereby makes the following findings <br />with respect to the Project: <br />1. This Governing Body has reviewed and considered the information <br />contained in the Draft ER and the Final ER, as updated by the Addendum, prior <br />to making a final decision on the Project, and all previous matters or <br />decisions undertaken by this Governing Body with respect to the Project were <br />of a preliminary nature related to the planning and development stage of the <br />