Laserfiche WebLink
CITY OF COLTON <br />MEASURE I TWENTY YEAR PLAN 1995/2015 <br />A NARRATIVE <br />The City of Colton General Plan Circulation Element currently identifies <br />proposed improvements of the City Street System for the next twenty years. <br />Implementation of these improvements is dependent on rates of development <br />and the availability of funding from a variety of sources, including Measure I <br />fiinds. Current emphasis is placed on street capacity improvements to <br />accommodate growing traffic volumes as identified in the 5 year measure I <br />plan. Colton is a mature City with an extensive existing road system. <br />Pavement management programs are currently implemented to protect this <br />sizable investment. As the City of Colton nears buildout estimated near 2025, <br />roadways constructed with Measure I funds will also experience a growing <br />need for protective maintenance. Over the next twenty years, the City will <br />substantially increase the allocation of Measure I funds for rehabilitation and <br />reconstruction of these existing facilities. <br />Attachments: City of Colton General Plan Circulation Element Update Street Cross <br />Sections; Typical Street Cross Sections. <br />EXHIBIT B <br />