Laserfiche WebLink
COLTON FIVE YEAR PLAN <br />1994-1995 <br />PROJECT TYPE PROJECT DESCRIPTION COST ESTIMATE <br />Widen Intersection Washington a Barton/Cootey Dr. $ 432,000.00 <br />Cooley Dr. <br />Engineer Roadway Washington/San Antonio to La Cadena 663,000.00 <br />Reconstruction Rancho Avenue Remove Angle Point TSM 55 000.00 <br />RTIP 08-031153 ° <br />Widen to 4 Lanes Reche Canyon Road, Washington to City Limit 1,301,000.00 <br />RTIP 08-031154 <br />Widen <br />Washington Street Bluff Road to Cooley Drive <br />313,000.00 <br />RTIP 08-031155 <br />Widen <br />Colton Avenue - Mt. Vernon to City Limits <br />255,000.00 <br />RTIP 08-031156 <br />Widen Bridge <br />Mill Street, Bordwell to Rancho <br />4,321,000.00 <br />RTIP 08-031157 <br />Construct, GAP Closure <br />Eucalyptus San Bernardino to Valley <br />357 000.00 <br />Signal Interconnect <br />La Cadena at Valley Blvd. <br />244 000.00 <br />Widen Overcrossing <br />Mt. Vernon at I-10 <br />14,116,000.00 <br />Signals, Coordination <br />Mt. Vernon at I-10 <br />463,000.00 <br />Engineer & Design <br />Overcrossing Widening Pepper Avenue at I-10 <br />1,620,000.00 <br />Widen <br />Pepper Avenue I-10 to Randall <br />296,000.00 <br />Reconstruct <br />S. La.Cadena Santa Ana River to Santa Fe <br />507,000.00 <br />Rehabilitate Signals <br />Valley Blvd. Rancho to Mt. Vernon <br />1,212,000.00 <br />Widen to 6 Lanes <br />Washington from Waterman <br />782,000.00 <br />Construction Facility <br />Park & Ride Facility located at Sperry <br />15 000.00 <br />and Fairway <br />' <br />Signalization <br />North La Cadena Drive Signal Interconnection <br />17,084.00 <br />Construction <br />Street Improvements "M" Street, 6th, and <br />219,327.00 <br />Congress <br />Construction <br />Reche Canyon Road Street Improvements <br />58 166.00 <br />, <br />Construction <br />So. La Cadena Beautification - PH 2 & 3 <br />1,058,272.00 <br />Construction <br />Bicycle Lane along Agua Mansa Road <br />495,595.00 <br />�, i <br />