My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-02-22 Adding Section 12.08.230 to the Colton Muni Code to Enact a Pavement Cut Moratorium to Preserve newly Paved Streets
Colton
>
CITY CLERK
>
City Council Ordinances
>
2000s
>
2022
>
O-02-22 Adding Section 12.08.230 to the Colton Muni Code to Enact a Pavement Cut Moratorium to Preserve newly Paved Streets
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2023 4:31:05 AM
Creation date
3/16/2022 1:59:10 PM
Metadata
Fields
Template:
City Clerk
Agenda Type
City Council
CC - Doc Type
Ordinance
Date
3/1/2022
Ordinance No.
O-02-22
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />4. Service for new development or new customers where no other <br />reasonable means of providing service exists. <br />5. Other situations deemed by the Director to be in the best interest of <br />the general public. <br />Emergencies and other exceptions do not exempt the permittee from <br />any requirements to repair the pavement as included herein or as <br />conditions of approval of a permit. The provisions of this section shall <br />not apply to officers or employees of the City acting in the discharge of <br />their official duties. <br />D. Waiver Application. To apply for a waiver to excavate within a public <br />street within five (5) years of the completion date of the street construction, <br />reconstruction, or overlay or within three (3) years of the date of notice of <br />completion of slurry seal, the applicant must submit a written request to the <br />Director. The request must include the following: <br />1. The location of the excavation. <br />2. Description of the work to be performed. <br />3. A statement from the applicant setting forth good cause for why the <br />work was not performed before the public street was resurfaced. <br />4. A statement from the applicant setting forth good cause for why the <br />work cannot be deferred until after the five (5) year period. <br />5. A statement from the applicant setting forth good cause for why the <br />work cannot be performed at another location. <br />E. Permit Conditions. In the event that a waiver is granted under <br />subsection (C) of this section, any excavation in the public street shall be <br />repaired in accordance with any and all conditions of the permit and the <br />following standards: <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.