My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2001 RES R-107-01
Colton
>
CITY CLERK
>
City Council Resolutions
>
2001-2010
>
2001
>
2001 RES R-107-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2014 9:48:40 AM
Creation date
2/20/2014 11:25:47 AM
Metadata
Fields
Template:
General Documents
Created By
admin
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF COLTON <br />MEASURE I FIVE YEAR PLAN 1999/2004 <br />YEAR <br />STREET & LIMITS <br />IMPROVEMENT <br />COST EST. <br />2002/03 <br />South Mt. Vernon Avenue <br />Rehabilitation of Roadway <br />$ <br />50,000.00 <br />Washington to Terrace <br />Engineering <br />2002/03 <br />Colton Avenue <br />Road Widening <br />$ <br />230,000.00 <br />Mt. Vernon to City line <br />Construction <br />2002/03 <br />Mt. Vernon <br />4 -way signalization <br />$ <br />85,000.00 <br />1-10 East bound on/off ramp <br />Colton one leg of intersection <br />2002/03 <br />Street Pavement Rehabilitation Phase 2 <br />Street overlay <br />$ <br />310,000.00 <br />2003/04 <br />Barton Road Bridge <br />Bridge replacement <br />$ <br />270,000.00 <br />(Joint agreement with Grand Terrace) <br />2003/04 <br />Street Pavement Rehabilitation Phase 3 <br />Street overlay <br />$ <br />60,000.00 <br />2004/05 <br />Washington Street <br />Street Widening <br />$ <br />60,000.00 <br />Bluff Road to Cooley <br />Engineering Design <br />2004/05 <br />Street Pavement Rehabilitation Phase 4 <br />Street overlay <br />$ <br />55,550.00 <br />2005/06 <br />Reche Canyon <br />Missing links of curb & gutter <br />$ <br />482,000.00 <br />Washington St to County Line <br />Construction <br />2005/06 <br />Street Pavement Rehabilitation Phase 5 <br />Street overlay <br />$ <br />122,450.00 <br />2006/07 <br />Reche Canyon <br />Street Widening <br />$ <br />1,435,000.00 <br />1/2 mile south of Washington Street <br />Construction <br />to County line <br />2006/07 <br />Street Pavement Rehabilitation Phase 6 <br />Street overlay <br />$ <br />100,000.00 <br />Contact: James King Measure I Revenue Estimate (5 Yrs.) $ 3,260,000.00 <br />(909) 370-5074 <br />Resolution No. <br />EXHIBIT B <br />
The URL can be used to link to this page
Your browser does not support the video tag.