Laserfiche WebLink
CITY OF COLTON <br />MEASURE I FIVE YEAR PLAN 1999/2004 <br />YEAR <br />STREET & LIMITS <br />IMPROVEMENT <br />COST EST. <br />2002/03 <br />South Mt. Vernon Avenue <br />Rehabilitation of Roadway <br />$ <br />50,000.00 <br />Washington to Terrace <br />Engineering <br />2002/03 <br />Colton Avenue <br />Road Widening <br />$ <br />230,000.00 <br />Mt. Vernon to City line <br />Construction <br />2002/03 <br />Mt. Vernon <br />4 -way signalization <br />$ <br />85,000.00 <br />1-10 East bound on/off ramp <br />Colton one leg of intersection <br />2002/03 <br />Street Pavement Rehabilitation Phase 2 <br />Street overlay <br />$ <br />310,000.00 <br />2003/04 <br />Barton Road Bridge <br />Bridge replacement <br />$ <br />270,000.00 <br />(Joint agreement with Grand Terrace) <br />2003/04 <br />Street Pavement Rehabilitation Phase 3 <br />Street overlay <br />$ <br />60,000.00 <br />2004/05 <br />Washington Street <br />Street Widening <br />$ <br />60,000.00 <br />Bluff Road to Cooley <br />Engineering Design <br />2004/05 <br />Street Pavement Rehabilitation Phase 4 <br />Street overlay <br />$ <br />55,550.00 <br />2005/06 <br />Reche Canyon <br />Missing links of curb & gutter <br />$ <br />482,000.00 <br />Washington St to County Line <br />Construction <br />2005/06 <br />Street Pavement Rehabilitation Phase 5 <br />Street overlay <br />$ <br />122,450.00 <br />2006/07 <br />Reche Canyon <br />Street Widening <br />$ <br />1,435,000.00 <br />1/2 mile south of Washington Street <br />Construction <br />to County line <br />2006/07 <br />Street Pavement Rehabilitation Phase 6 <br />Street overlay <br />$ <br />100,000.00 <br />Contact: James King Measure I Revenue Estimate (5 Yrs.) $ 3,260,000.00 <br />(909) 370-5074 <br />Resolution No. <br />EXHIBIT B <br />