CITY OF COLTON <br /> PUBLIC WORKS DEPARTMENT- ENGINEERING SECTION <br /> DATE: April 18,2023 <br /> FROM: Ed C.Vasquez <br /> TO: United Paving Co. <br /> 1880 North Delilah St. <br /> Corona CA 92879 <br /> CONTRACT CHANGE ORDER NO. 1 <br /> FY 21-22 CDBG COLT-20-1-03K/0178 Alley Rehab <br /> INSTRUCTIONS TO THE CONTRACTOR AT THE REQUEST OF THE PROJECT MANAGER: <br /> Price Increase for Asphalt, Credit for work not performed, Cost of additional concrete for ADA requirements <br /> I. INCREASED QUANTITY <br /> Item No. Description of Work Quantity Unit Unit Cost Total Cost <br /> 1 8"Thick Ribbon Gutter(includes Removal/Replacement)Alley 1 135.00 SF $ 28.00 = $ 3,780.00 <br /> 2 4"sidewalk(includes Removal/Replacement)Alley 1 140.00 SF $ 21.00 $ 2,940.00 <br /> 3 8"Thick Ribbon Gutter(includes Removal/Replacement)Alley 2 870.00 SF $ 28.00 $ 24,360.00 <br /> 4 4"sidewalk(includes Removal/Replacement)Alley 2 140.00 SF $ 21.00 $ 2,940.00 <br /> 5 8"Thick Ribbon Gutter(includes Removal/Replacement)Alley 3 460.00 SF $ 28.00 $ 12,880.00 <br /> 6 4"sidewalk(includes Removal/Replacement)Alley 3 100.00 SF $ 21.00 $ 2,100.00 <br /> 7 Tree Removal Alely 4 1.00 LS $ 1,380.00 $ 1,380.00 <br /> 8 Asphalt Material Increase Per ton 1,040.00 TON $ 4.08 $ 4,243.20 <br /> 9 Alley AC/Dirt Excess Removal Alley 3 1,700.00 SF $ 1.20 $ 2,040.00 <br /> 10 AC Slot Patch 2.00 TON $ 700.00 $ 1,400.00 <br /> 11 - LF $ - $ - <br /> TOTAL = $ 58,063.20 <br /> II. DECREASED QUANTITY <br /> Item No. Description of Work Quantity Unit Unit Cost Total Cost <br /> 1 Credit-Alley No.4 Survey 1.00 LS $ 2,100.00 $ 2,100.00 <br /> 2 Credit-Alley No.4 Demo/Grading 4,610.00 SF $ 1.20 $ 5,532.00 <br /> 3 Credit-Alley No.4 Concrete 208.00 TON $ 125.00 $ 26,000.00 <br /> 4 Credit Water Meter Boxes 6.00 EA $ 200.00 $ 1,200.00 <br /> SUB-TOTAL = $ 34,832.00 <br /> TOTAL AMOUNT OF CHANGE ORDER#1 = $ 23,231.20 <br /> III.CONTRACT AMOUNT RECONCILLATION <br /> ORIGINAL AMOUNT OF CONTRACT = $ 340,443.00 <br /> CHANGE ORDER NO.1 = $ 23,231.20 <br /> TOTAL COST OF CONTRACT AS PER CHANGE ORDER NO. 1 = $ 363,674.20 <br /> The amount of the contract will be increased by the sum of$23,231.20 (6.8% of the contract amount) and contract time shall be extended by 90 calendar <br /> days. The undersigned Contractor approves the foregoing Change Order# 1 as to the changes, if any, in the contract price specified for each item including <br /> any and all supervision costs and other miscellaneous costs relating to the change in work,and as to the extension of time allowed,if any,for completion of the <br /> entire work on account of said Change Order# 1.The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of <br /> the directly or indirectly related to the approved time extension,required to complete the Change Order items. This document will become a supplement of the <br /> contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the Owner. <br /> Execution of this Change Order by the Contractor constitutes a binding accord and satisfaction that fully satisfies, waives, and releases the Owner from all <br /> claims, demands, costs, and liabilities, in Contract, law or equity, arising out of or related to the subject of the change order, whether known or unknown, <br /> including but not limited to direct and indirect costs and/or damages for delay,disruption,acceleration, loss of productivity, and stacking of trades, as well as <br /> any and all consequential damages. <br /> William R.Smith, City Manager DATE <br /> Brian A.Dickinson, Public Works/Utilitity Services Director DATE <br /> Sabas Trujillo, United Paving Co. DATE <br /> 1 of 1 <br />