My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
R-097-23 Authorizing the City Manager or His Designee to Execute the Administering Agency-State Agreement No. 08-5065S21 and the Program Supplement Agreement No. 00000A297 with Caltrans for the HSIP Cycle 11
Colton
>
CITY CLERK
>
City Council Resolutions
>
2020-2026
>
2023
>
R-097-23 Authorizing the City Manager or His Designee to Execute the Administering Agency-State Agreement No. 08-5065S21 and the Program Supplement Agreement No. 00000A297 with Caltrans for the HSIP Cycle 11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2023 1:30:22 PM
Creation date
11/9/2023 1:30:22 PM
Metadata
Fields
Template:
City Clerk
Agenda Type
City Council
Date
11/7/2023
Resolution No.
R-97-23
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Victor Ortiz <br /> March 9, 2023 <br /> Page 2 • <br /> 3. For state funded HSIP projects,please note: <br /> a. the funding allocation process for HSIP projects with state HSIP Funding is different <br /> from projects in other programs such as ATP/STIP and SB1.The funding allocation <br /> for HSIP projects is processed through Caltrans DLA, not the CTC. <br /> b. The funding allocation request is Phase specific, i.e. Preliminary Engineering (PE), <br /> Right of Way(ROW)or Construction (CON). <br /> For more guidance on implementing State-funded HSIP projects, please visit <br /> https://dot.ca.gov/programs/local-assistance/fed-and-state-oroorams/hicthwav-safety- <br /> improvement-program/state-funded-hsio. <br /> 4. For federally funded HSIP projects,please follow the project authorization process in <br /> Chapter 3 of the Local Assistance Procedures Manual (LAPM). <br /> 5. The delivery of the HSIP Cycle 11 projects must meet the below milestones: <br /> a. The PE phase(if applicable)must be allocated by 12/31/2023; <br /> b. The Construction(CON) phase must be allocated by 3/31/2026(6 months may be <br /> added for projects with consultant for PE). <br /> c. The project must be completed and closed out by 3/31/2028(6 months may be <br /> added for projects with consultant for PE). <br /> HSIP project delivery requests and status of the projects are available at <br /> https://d'ot.ca.gov/oroa rams/local-assistance/fed-and-state-oroarams/hia hway-safety- <br /> improvement-proaram/deliverv-requirements-status-aoproved-proiects. <br /> 6. It is the agency's responsibility to review their project scope throughout the project delivery <br /> process and confirm that HSIP funding is used to fund the approved eligible scope as <br /> defined in your HSIP application. In case that any scope or cost change is needed, please <br /> contact your DLAE. <br /> 7. Prior to engaging in any Architectural and Engineering (ABBE)contract procurement(s), <br /> agencies should reference Chapter 10(Consultant Selection)of the Local Assistance <br /> Procedures Manual (LAPM), located at: httos://dot.ca.aov/oroarams/local- <br /> assistance/guidelines-and-procedures/local-assistance-procedures-manual-lapm. <br /> If you have any questions about your project, please contact your DLAE. <br /> Sincerely, <br /> Alberto Verge!De Dios <br /> District Local Assistance Engineer <br /> "Provide a safe,sustainable,integrated and efficient transportation system <br /> to enhance California's economy and livability" <br />
The URL can be used to link to this page
Your browser does not support the video tag.