My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agreement/Reche Canyon Mutual Water Company
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2001
>
02/20/2001 6:00 pm
>
STAFF REPORTS:
>
UTILITY DIRECTOR:
>
Agreement/Reche Canyon Mutual Water Company
>
Agreement/Reche Canyon Mutual Water Company
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2014 6:37:01 PM
Creation date
2/19/2014 8:54:15 PM
Metadata
Fields
Template:
Agenda Item
Item Number
1
Subject (2)
Participation Agreement between the City of Colton and Reche Canyon Mutual Water Company for the Extension of a Ten-inch Water Line in Reche Canyon.
Submitted On
4/28/2003
Submitted By
Sabdi Espinoza
Item Title
Agreement/Reche Canyon Mutual Water Company
ATRequest
144
Status (2)
2
Department
City Clerk
Meeting Date
2/20/2001
Meeting Time
6:00:00 PM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
relating to prevailing wages, including but not limited to, Sections 1770 through 1775 inclusive <br />of the California Labor Code and Title 8 of the California Code of Regulations. <br />3.4 Progress Reports and Billings; Records. Company shall require progress reports <br />and billings every thirty (30) days from the design professionals and contractor performing <br />construction and installation of the Project. Within seven (7) days of its receipt of such progress <br />reports and billings, Company shall be responsible for determining their accuracy and providing <br />full and accurate copies to City. Company shall also be responsible for paying all approved <br />charges within the time required by state law. Company shall maintain complete and accurate <br />records with respect to all costs and expenses pursuant to this Agreement. All such records shall <br />be clearly identifiable. Company shall allow a representative of City during normal business <br />hours to examine, audit and make transcripts or copies of such records and any other documents, <br />proceedings, and activities related to the Agreement for a period of three (3) years from the <br />termination/expiration of this Agreement. <br />3.5 Inspection and Transfer of Project. Without modifying or limiting Company's <br />obligations under this Agreement, City shall inspect and test the Project. City shall have access <br />to the Project site at all times to conduct any tests or inspections. Any deficiencies in the Project <br />shall be corrected by Company at its sole cost and expense. Upon completion of the Project to <br />the satisfaction of City, the Project shall be presented to the City Council for dedication and <br />acceptance. The City Council shall accept the Project if it determines that it was constructed in <br />accordance with approved plans, specifications and contract documents, that it operates <br />satisfactorily, and that all other requirements of this Agreement have been satisfied. Upon <br />acceptance of the Project, Company shall assign to City all of Company's rights and remedies, <br />including warranties, as set forth in the approved contract documents. Company will be required <br />to convey title to the Project to City. The form of said title shall be determined by City. City <br />shall not be responsible for any accident, loss, or damage to said Project prior to acceptance by <br />City. Company shall guarantee all work and materials for the Project to be free from all defects <br />due to faulty materials or workmanship for a period of one (1) year from the date of acceptance <br />by City. <br />3.6 Fees and Charges. Nothing in this Agreement shall be deemed as payment, <br />satisfaction, or waiver of any fees or charges which may be imposed upon Company in <br />connection with the provision of Emergency Service or performance of this Agreement. <br />3.7 Terms of Reimbursement. Company shall be eligible for reimbursement in an <br />amount equal to the difference between the costs of the Facilities with the <br />Oversized Portion and the costs of the Facilities. The costs to be taken into <br />account in determining the amount eligible for reimbursement shall be the costs of <br />design, construction, and installation of the respective facilities. The amount of <br />said costs eligible for reimbursement, absent an amendment to this Agreement, <br />shall not exceed the sum of One Hundred Thousand Dollars and No Cents <br />($100,000) ("Estimated Reimbursement Amount"). The Estimated <br />Reimbursement Amount is City's most recent estimate of the difference between <br />the costs of the Facilities with the Oversized Portion and the Cost of Facilities. <br />RVPUBVM607452 <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.