Laserfiche WebLink
05.25%01 08:58 FAX 5408458212 <br />NERAL�4-..-'RACIFIC <br />FPC SWITCHGEAR 4 MCAVOY&MARhMAM 2001 <br />Tracy Hladsos, Sales & Application Specialist <br />P.O. Box 8200 • Brlalol, VA 24203-8200 <br />(640) 646-8863 • FAX (540) 645-8212 <br />t o l e dt oe @,ei ectro-mechanical . c o rn <br />FP QUOTATION <br />TO: Rich - McAvoy & Markham Engineering <br />CC: Rod Broadie - FP <br />DATE: May 25, 2001 <br />SUBJECT: UQ for City of Colton <br />FP Quotation - 510027 <br />TOTAL NUMBER OF PAGES 3 (including this sheet) <br />t1i QtY 17escrl_ption <br />1 2 PSE -9-44222-T7 <br />15K.V, 95KV BIL, Dead Front, Air Insulated, Padmounted <br />Switchgear with two (2) 3 -pule 600 amp group operated Auto jet <br />switches and two (2) 3-phase set(s) fuse mountings for SMIJ-20 <br />fuses, Elbows and inserts are not included. Included are mounting <br />provisions only with viewing window to accommodate one three- <br />phase fault indicator in each switch Compartment with fault <br />indicator viewing window on associated door <br />Price..................................................................$ 7,843.00 each <br />2 12 SMI,20 Fuse End Fittings - price: S 152.00 each <br />3 12 SMU-20 5 C Type R ]Fuse Units - Pn- e: $ 73.00 each <br />Shipments can begin to be made in approximately 5-10 weeks after receipt of your formal <br />purchase order, complete with all technical details and data required to release the equipment for <br />manufacture. If a better shipping schedule is required, please consult the factory for review of <br />current manufacturing schedule. When drawing approval is required, the above shipping <br />estimates must be increased by the time necessary for the ftwing approval process, Approval <br />drawings (if required) will be submitted 2-3 weeks after receipt of an order. The shipping <br />estimates are subject to change at time of order based on current production backlog. <br />PowER To DELivER <br />