My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AR-Bid for Median Project on Washington St
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2001
>
07/17/2001 6:00 pm
>
CONSENT CALENDAR:
>
Bids/Median Project
>
AR-Bid for Median Project on Washington St
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2014 8:18:11 PM
Creation date
2/19/2014 8:57:36 PM
Metadata
Fields
Template:
Agenda Item
Item Number
18
Subject (2)
Authorization to solicit Bids for Construction of Washington Street Median Project.
Submitted On
10/23/2003
Submitted By
Sabdi Espinoza
Item Title
AR-Bid for Median Project on Washington St
ATRequest
396
Status (2)
2
Department
City Clerk
Meeting Date
7/17/2001
Meeting Time
6:00:00 PM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
___ __. ____, <br />IDDING SCHEDULE <br />FOR <br />SANTA ANA RIVER PROJECT AREA <br />WASHINGTON STREET MEDIAN IMPROVEMENTS: <br />INSTALLATION OF CURB AND GUTTER,AC, DRAINAGE STRUCTURES AND LANDSCAPE <br />ITEM ESTIMATED QUANTITY <br />NO. ITME DESRIPTION QUANTITY UNIT PRICE TOTAL AMOUNT <br />1 <br />MOSILI7-AT70N <br />LS <br />LS <br />$ 30,000.00 <br />$ <br />30,000.00 <br />2 <br />CLEARING AND GRUBBING A REMOVALS <br />LS <br />LS <br />$ 17,000.00 <br />$ <br />17,000.00 <br />3 <br />EARTHWORK <br />LS <br />LS <br />$ <br />8,000.00 <br />$ <br />8,000.00 <br />4 <br />CRUSHED MISCELLANEOUS RASE <br />595 <br />CY <br />$ <br />40.00 <br />$ <br />23,800.00 <br />5 <br />CONS TRUCT ASPHAL T CONCRETE OVERLAY <br />93 <br />TON <br />$ <br />50.00 <br />$ <br />4,650.00 <br />6 <br />CONSTRUCT ASPHALT CONCRETE PAVEMENT <br />1,040 <br />TON <br />$ <br />50.00 <br />$ <br />52,000.00 <br />7 <br />CONSTRUCT ENHANCED CONCRETE PAVEMENT <br />24,765 <br />SF <br />$ <br />5.50 <br />$ <br />136,207.60 <br />8 <br />8 -INCH CURB AND GUTTER <br />4,253 <br />LF <br />$ <br />12.00 <br />$ <br />51,036.00 <br />CONSTRUCT SIDEWALK d <br />9 <br />WHEELCHAIR RAMP RECONSTW <br />SF <br />$ <br />$ <br />' <br />INSTALL 18" CORRUGATED POLYETHLE <br />10 <br />(ADS OR EQUIVALENT) <br />60 <br />LF <br />$ <br />36.00 <br />$ <br />2,160.00 <br />INSTALL 36' CORRUGATED POLYETHLE <br />11 <br />(ADS OR EQUIVALENT) <br />500 <br />LF <br />$ <br />68.00 <br />$ <br />68.00 <br />INSTALL 42' CORRUGATED POLYETHLE <br />12 <br />(ADS OR EQUIVALENT) <br />573 <br />LF <br />$ <br />75.00 <br />$ <br />75.00 <br />INSTALL 48' CORRUGATED POLYETHLE <br />13 <br />(ADS OR EQUIVALENT) <br />380 <br />LF <br />$ <br />86.00 <br />$ <br />32,680.00 <br />14 <br />CONSTRUCT CATCH BASIN W =4', W- 4' <br />4 <br />EA <br />$ 2,600.00 <br />$ <br />10,000.00 <br />15 <br />CONSTRUCT CATCH BASIN Wad' Va6' <br />1 <br />EA <br />$ 3,000.00 <br />$ <br />3,000.00 <br />16 <br />CONSTRUCT CONCRETE COLLAR <br />1 <br />EA <br />$ <br />500.00 <br />$ <br />500.00 <br />17 <br />INSTALL STORM ORAIN MANHOLE <br />6 <br />EA <br />$ 2,500.00 <br />$ <br />15,000.00 <br />18 <br />TRAFFIC STRIPING AND PAVEMENT MARKINGS <br />L5 <br />$ 2,000.00 <br />$ <br />2,000.00 <br />19 <br />STREET LIGHTFOUDATIONS <br />13 <br />EA <br />$ <br />800.00 <br />$ <br />800.00 <br />20 <br />INSTALL PULL Box <br />9 <br />EA <br />$ <br />100.00 <br />$ <br />900.00 <br />21 <br />INSTALL 3' SCHED. 40 PVC CONDUIT <br />LF <br />$ <br />$ <br />" <br />22 <br />INSTALL 100- AMP METER FOR LIGHTING d IRRIGATIOA 1 <br />EA <br />$ <br />$ <br />23 <br />INSTALL 1 1!2' GALVINIZED IRRIGATION LATERAL <br />LF <br />$ <br />$ <br />" <br />24 <br />PALMS <br />16 <br />EA <br />$ <br />750.00 <br />$ <br />12,000.00 <br />25 <br />15•GALLON TREES <br />32 <br />EA <br />$ <br />100.00 <br />$ <br />3,200.00 <br />26 <br />5 -GALLON SHRUBS <br />2,502 <br />EA <br />$ <br />25.00 <br />$ <br />70,050.00 <br />27 <br />1 -GALLON TREES <br />1,648 <br />EA <br />$ <br />8.00 <br />$ <br />13,184.00 <br />28 <br />ANNUAL COLOR <br />41 <br />FLAT <br />$ <br />25.00 <br />$ <br />1,025.00 <br />29 <br />SOIL PREPARATION <br />56,940 <br />SF <br />$ <br />0.30 <br />$ <br />17,082.00 <br />30 <br />MULCH <br />23,366 <br />SF <br />$ <br />0.T5 <br />$ <br />17,524.50 <br />31 <br />IRRIGATION <br />56,940 <br />SF <br />$ <br />1.00 <br />$ <br />56,940.00 <br />32 <br />90-DAYMAINTENANCE <br />LS <br />LS <br />$ <br />2,000.00 <br />$ <br />2,000.00 <br />$ <br />582'882'00 <br />Subtotal <br />$ <br />87,432.30 <br />15 % Coatlapancy <br />TOTAL _ $ 670,314.30 <br />Q-A <br />
The URL can be used to link to this page
Your browser does not support the video tag.