My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AR 011706 Award of Contract/CH2MHILL
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2006
>
01/17/2006 6:00 pm
>
CONSENT CALENDAR
>
Award of Contract/CH2MHILL -
>
AR 011706 Award of Contract/CH2MHILL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2014 10:25:02 AM
Creation date
2/19/2014 9:34:44 PM
Metadata
Fields
Template:
Agenda Item
Item Number
13
Subject (2)
Award of Contract with CH2MHILL Inc., for Design of Electric System to provide Service to Pellisier Ranch Project in the Amount Not-to-Exceed $39,898.
Submitted On
1/12/2006
Submitted By
Sabdi Espinoza
Item Title
AR 011706 Award of Contract/CH2MHILL
ATRequest
570
Status (2)
2
Department
City Clerk
Meeting Date
1/17/2006
Meeting Time
6:00:00 PM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "A" <br />SCOPE OF SERVICES <br />Introduction <br />C112M Hill (Consultant) shall investigate the feasibility of providing electric service to the Pellisier Ranch area, and <br />present to Colton Electric (City) viable executable alternatives to satisfy those requirements. <br />Consultant is aware that this project will involve the review of the current distribution system. The review is <br />necessary to determine the alternatives required to modify or upgrade the system for supplying the load of the Ranch <br />and additional loads discussed at the pre-bid meeting. As one more alternative, Consultant shall also investigate the <br />scenario of adding a new distribution substation to the system, which shall provide power to the Ranch and other <br />loads, while offering a tie and back-up to other existing circuits, such as the "La Cadena Feeder." <br />The results of the review and investigation, as well as of the alternatives, shall be presented to the City in a Final <br />Report. The Final Report shall include the documents or references used in the investigation, assumptions that were <br />made, a description of the various alternatives investigated, the estimated cost of the various alternatives, the <br />comparison of the pros and cons between the alternatives and the Consultant's recommendation to the City. In <br />addition, the appropriate members of the CH2M Hill Team shall be made available to support Colton Electric in its <br />presentation to the City of Colton City Council and/or other third parties. <br />Project Approach and Scope of Services <br />C112M Hill shall consider the approach used to execute this type of project to be critical to its success in determining <br />the viable alternatives that would be available to Colton Electric. Alternatives must offer solutions that satisfy the <br />following criteria: <br />Provide reliable and safe long term operation <br />Be recognized as good industry practice <br />Meet Colton Electric practices and standards <br />Provide ease of construction with none or minimal disruption to ongoing service <br />Provide ease of long term maintenance <br />Incorporate the latest industry tools and equipment <br />Be cost effective <br />In order to effectively execute this project, Consultant shall perform the necessary distribution system studies and <br />investigation using the overall project approach listed below. Throughout this process, Consultant shall continue <br />ongoing communications with Colton Electric to ensure that its staff is kept up-to-date with the status of the project <br />Assuring close communications will alleviate interface issues, reduce review times and result in a more integrated <br />product that meets the requirements of Colton Electric. The major tasks in the project approach shall be as follows: <br />Task A: Project Kickoff Meeting. <br />Task B: Site/System Walkdown and Data Collection. <br />Task C: Data Analysis, Evaluation and Preliminary Alternatives. <br />Task D: Discussion of Prelirninary Alternatives with Colton Electric. <br />Task E: Establish Acceptable Final Alternatives and Issue Draft of Final Report. <br />Task F: Discussion of Final Alternatives with Colton Electric. <br />Task G: Issue Final Report. <br />Task FL Progress Reports and Project Status Updates. <br />Task I Assist in the Presentation to the Board of Directors (optional). <br />Task A: Project Kickoff Meeting <br />Consultant to coordinate a meeting at the Colton Electric offices shortly after the award of the contract. The purpose <br />of this meeting will be to discuss the Scope of Work and Schedule as presented in the Consultant's proposal and <br />adjust the Scope of Work as necessary to meet any additional, new or modified requirements of Colton Electric. <br />01�ANGE\GPP\13728 1 <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.