My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AR 040406 MOU
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2006
>
04/04/2006 6:00 pm
>
CONSENT CALENDAR
>
MOU
>
AR 040406 MOU
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2014 7:00:19 PM
Creation date
2/19/2014 9:43:22 PM
Metadata
Fields
Template:
Agenda Item
Item Number
16
Subject (2)
- Approve and Authorize the City Manager to Execute the Memorandum of Understanding by and between the County of San Bernardino, City of Rialto, City of Colton, West Valley Water District and Fontana Water Company Regarding the Allocation of Funds to be sought from the United States regarding Groundwater Clean-up in the Rialto-Colton and neighboring basins.
Submitted On
3/30/2006
Submitted By
Sabdi Espinoza
Item Title
AR 040406 MOU
ATRequest
715
Status (2)
2
Department
City Clerk
Meeting Date
4/4/2006
Meeting Time
6:00:00 PM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Process selection and detailed design of water treatment systems and associated <br />appurtenances; <br />• Acquisition of land, easements, and rights of way; and, <br />• Construction of extraction wells, piping and water treatment systems. <br />Work to construct the "160 -Acre Parcel" treatment system is expected to cost approximately <br />50% more than the system being installed by the County (excluding the cost of real estate) as <br />detailed in Table 1. A summary of costs for the plume containment efforts are as follows: <br />Task <br />Description <br />Includes <br />Estimated Costs <br />2.1 <br />Engineering Design <br />Work Plan, Conceptual Model and <br />$1,605,000 <br />Plume Interception Design <br />Data Collection/ <br />For Contamination from both Bunker <br />$9,375,000 <br />2.2 <br />Characterization <br />Area and 160 -Acre Areas <br />2.3 <br />Plume Containment <br />For County's Bunker Area System and <br />$21,250,000 <br />New 160 -Acre Area System <br />TOTALS <br />$32,230,000 <br />4.3 Allocation of Funding <br />The parties request that the proposal "PROPOSED INITIAL 5 -YEAR GROUNDWATER <br />CLEANUP APPROACH RIALTO-COLTON AND NEIGHBORING BASINS, SAN <br />BERNARDINO COUNTY, CALIFORNIA" be funded in its entirety. However, in the event that <br />any funds are received in an amount less than the total amount requested, such funds will be <br />divided equally between the parties, each party receiving 20% of the funds. <br />Rialto -Colton Basin Technical Committee- White Paper <br />Revised 2/22/2006 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.