My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AR 060606 Inland Empire Construction - City hall remodel phase II
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2006
>
06/06/2006 06:00 PM
>
CONSENT CALENDAR
>
Change Order/Inland Empire Construction Inc.
>
AR 060606 Inland Empire Construction - City hall remodel phase II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2014 7:08:31 PM
Creation date
2/19/2014 10:14:57 PM
Metadata
Fields
Template:
Agenda Item
Meeting Date
6/6/2006
Meeting Time
6:00:00 PM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DATE: March 14, 2006 <br />FROM: AMER JAKHER, P.E., PW DIRECTOR/CITY ENGINEER <br />CITY OF COLTON <br />TO: INLAND EMPIRE CONSTRUCTION, INC. <br />7409 PALM AVE. <br />HIGHLAND, CA 92346 <br />PUBLIC WORKS DEPARTMENT- ENGINEERING DIVISION <br />CONTRACT CHANGE ORDER No. 1 <br />Wall Framing & T -Bar Ceiling Project <br />INSTRUCTIONS TO THE CONTRACTOR AT THE REQUEST OF THE CITY ENGINEER: <br />These modifications are based upon site requirement for the completion of the project. <br />I. INCREASED QUANTITY <br />Item No. Description of Work Quantity Unit Unit Cost Total Cost <br />- Laminate Drywall to existing block walls, 1 LS 2,580.00 = 2,580.00 <br />frame and hang columns to conceal pipe <br />columns, skim and prep coate corridor walls = <br />for smooth finish <br />SUB -TOTAL <br />11. DECREASED QUANTITY <br />Item No. Description of Work <br />= $ 2,580.00 <br />Quantity Unit Unit Cost Total Cost <br />*** NOT APPLICABLE <br />SUB -TOTAL = $ <br />TOTAL AMOUNT OF CHANGE ORDER #1 <br />= $ <br />2,580.00 <br />Ill. CONTRACT AMOUNT RECONCILLATION <br />ORIGINAL AMOUNT OF CONTRACT <br />= $ <br />24,113.00 <br />CHANGE ORDER NO. 1 <br />= $ <br />1,585.00 <br />CHANGE ORDER NO. 2 <br />= $ <br />2,580.00 <br />TOTAL COST OF CONTRACT AS PER CHANGE ORDER NO. 2 <br />= $ <br />28,278.00 <br />END OF CHANGE ORDER NO. 2 <br />CHANGE ORDER NO. 2 IS HEREBY ACCEPTED AND AGREED UPON <br />AMER JAKHER, P.E., CITY ENGINEER <br />DARYL PARRISH, CITY MANAGER <br />INLAND EMPI <br />DATE <br />DATE <br />DATE <br />File: Final CHANGE ORDER -Wall Framing Page 1 of 1 Date Printed: 5/29/2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.