AR 100306 Young & Company
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2006
>
10/03/2006 6:00 pm
>
CONSENT CALENDAR
>
Bid/Young & Company
>
AR 100306 Young & Company
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2014 8:06:57 PM
Creation date
2/19/2014 10:27:08 PM
Metadata
Fields
Template:
Agenda Item
Item Number
11
Subject (2)
- Award of Bid for Various Size Transformers for the Electric Utility to Young & Company in the Amount of $61,607.14, per Section 3.08.140(e) of the Colton Municipal Code.
Submitted On
9/28/2006
Submitted By
Sabdi Espinoza
Item Title
AR 100306 Young & Company
ATRequest
1078
Status (2)
2
Department
City Clerk
Meeting Date
10/3/2006
Meeting Time
6:00:00 PM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF COLTON <br />AGENDA REPORT <br />FOR COUNCIL MEETING OF OCTOBER 3, 2006 <br />TO: HONORABLE MAYOR AND CITY COUNCIL <br />FROM: Jeannette Olko, Electric Utility General Manager <br />SUBJECT: Reject All Bids and award Contract for Purchase of Various <br />Transformers to Young and Company in the Amount of <br />$61,607.14 per Section 3.08.140(e) of the Colton Municipal <br />Code <br />DATE: September 28, 2006 <br />BACKGROUND: <br />The City purchases transformers into Electric Stores inventory when the need arises to upgrade, <br />replace, or install a new transformer for an Electric customer. The City also orders back-up <br />transformers to be used to replace a transformer that goes bad in the system. Back-up <br />transformers are necessary, due to the long delivery time. The extreme heat wave this past <br />summer caused many transformers to fail. As a result, the City's inventory of back-up <br />transformers has been severely depleted. In addition, the combination of last year's hurricanes, <br />and this past summer's record heat nationwide have caused delivery lead times to increase <br />dramatically. <br />DISCUSSION/ANALYSIS: <br />On September 6, 2006, the Electric Department posted a Notice Inviting Bids for these <br />transformers on the BidNet Network. Fifty-six vendors registered to supply distribution <br />transformers were notified through the BidNet system. A public bid opening was held at 10:30 <br />A.M. on September 25, 2006 at the Electric Department Administrative offices. Three bids were <br />received and evaluated. <br />A Bid Analysis is attached showing the price and delivery quoted by each vendor. The <br />recommended vendor's price is underlined for each size transformer. The total of bid award is <br />listed at the bottom for the recommended vendor. <br />Also attached is a Transformer Load Loss Evaluation. This evaluation shows the life cycle cost of <br />the transformer over its useful lifetime, using a combination of loss calculations supplied by the <br />transformer manufacturer and the unit price quoted by the vendo C. To evaluate the lowest cost <br />bid, the life cycle costs demonstrate the cost of the transformer over its "in-service" life, taking into <br />consideration the degradation over time. The transformer that loss the least over the useful life <br />results in the lowest cost of the equipment. It is a function of which manufacturer has the least <br />loss. <br />The lowest bid was from McAvoy & Markham, who bid ERMCO transformers. The delivery lead <br />time quoted by McAvoy & Markham is 36-38 weeks, three and a half months longer than the <br />delivery time of the other two bidders. This is the first instance in which the City has received a <br />bid from this manufacturer and the Electric Utility's Engineering Division has not had the <br />opportunity to research and evaluate their processes to determine if they will meet the long term <br />reliability and efficiency goals of the utility. The other two manufactures quoted by other vendors, <br />Howard and Central Moloney, have been evaluated by the City previously, and are proven to meet <br />our needs. As stated above, the City's back-up :Mock of transformers was severely depleted this <br />
The URL can be used to link to this page
Your browser does not support the video tag.