BID SCHEDULE (REVISED)
<br />WELL PLANT NO.22 UPGRADE PROJECT
<br />TIME OF COMPLETION: 150 CALENDAR DAYS FOR PHASE I
<br />AND AN ADDITIONAL 215 CALENDAR DAYS FOR PHASE II
<br />ITEM
<br />NO.
<br />DESCRIPTION
<br />QTY
<br />UNITS
<br />UNIT PRICE
<br />TOTAL
<br />I
<br />Mobilization, Insurance, Permits, and Demobilization.
<br />1
<br />LS
<br />to I Oto4 en
<br />1011 OLA
<br />2
<br />Furnish and Install SWPP and BMPs in accordance with 2022 California
<br />1
<br />LS.
<br />Construction General Permit.
<br />3
<br />Provide sheeting, shoring, and bracing for excavations, or equivalent
<br />1
<br />LS.
<br />C0,000
<br />5, 000
<br />method conforming to applicable safety orders.
<br />4
<br />Perform initial site demolition to demolish, remove, salvage, cap and/or
<br />1
<br />LS.
<br />properly dispose of all items, including but not limited to above and
<br />below grade waterline piping, fittings, and appurtenances, valves eye
<br />3'11200$�
<br />.3-7, �$�^
<br />wash station and appurtenances, chlorine shed and equipment, shade
<br />structure, lighting, electrical conduits and conductors, pipe supports, AC
<br />and PCC pavement, and all related work
<br />Perform initial site demolition to demolish, remove, salvage, cap and/or
<br />I
<br />LS,
<br />properly dispose of all items, including but not limited to, electrical
<br />«I
<br />5
<br />cabinets, electrical equipment, antenna, conduits and conductors, and all
<br />related work. This phase shall be completed following completion of the
<br />new electricals stem.
<br />6
<br />Perform site work, including site grading, installation of crushed
<br />I
<br />LS.
<br />got 534°�-
<br />$Ol 530a
<br />aggregate base material, asphalt pavement, and all related work.
<br />7
<br />Prepare building foundations and PCC slabs, including but not limited to,
<br />1
<br />LS,
<br />subgrade preparation, engineered fill, reinforcements, embedment,
<br />92
<br />ao
<br />anchors, building roller assembly (materials furnished by Rollapart'—
<br />Buildings), equipment pads, floor drains, ABS pipe and fittings,
<br />connection, testing, and all related work.
<br />8
<br />Construct well head improvements, including construction of raised pump
<br />LS.
<br />pedestal, extending well casing, gravel access, vent sounding tubes,
<br />'L`-7 al3
<br />piping, and construction of well pump foundation with embedment and
<br />anchors, and all related work
<br />9
<br />Furnish and install deep well vertical turbine pumping unit including all
<br />I
<br />LS.
<br />appurtenant components (975 gpm at 650 TDH pump, 200 HP motor, oil
<br />i12o-1
<br />lubricated, 3" x 1-1 1 /16" oil tube and shaft, 8" heavy wall column piping,
<br />541 t'l��
<br />fabricated pump head, etc.) and all related work.
<br />10
<br />Perform web -based witnessed certified factory well pump performance
<br />test.
<br />I
<br />LS.
<br />(,
<br />, `tQ 00
<br />1$60
<br />U
<br />11
<br />Perform mechanical cleaning (10 minutes per 5' interval) including
<br />I
<br />LS.
<br />O�+
<br />brushing, bailing, disposal of all sediments/debris removed, video
<br />p!r
<br />�011 sook
<br />recording re and post), disinfection, and all related work.
<br />t v-jtGJ'
<br />12
<br />Construct well discharge line, including but not limited to, 12" EL&C
<br />1
<br />LS.
<br />above grade and 12" CML&C below grade standard weight steel
<br />discharge piping including eccentric reducer, equipment connection
<br />Z133 38Gj`
<br />20S
<br />fitting, air valves, pressure transmitters and switches, flow meter,
<br />13bS`2
<br />efficiency port, water quality sampling port, check valve, butterfly valves,
<br />pipe supports, accessory couplings and appurtenances, thrust blocks,
<br />connection to existing 12" AC pipeline, disinfection, testing, and all
<br />related work
<br />BID FORM (REVISED)