My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AR 112106 Prado Park project
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2006
>
11/21/2006 6:00 pm
>
CONSENT CALENDAR
>
Prado Park Project
>
AR 112106 Prado Park project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2014 8:15:40 PM
Creation date
2/19/2014 10:47:10 PM
Metadata
Fields
Template:
Agenda Item
Item Number
16
Subject (2)
- Approve and Adopt a Resolution Increasing the Fiscal Year 2006/2007 Capital Improvement Program Budget in the Amount of $20,000 for the Prado Park Project; Authorize the Award of a Construction Agreement to Ken Thompson, Inc for the Prado Park Project, in the Amount of $49,980, RESOLUTION NO. R-154-06.
Submitted On
11/16/2006
Submitted By
Sabdi Espinoza
Item Title
AR 112106 Prado Park project
ATRequest
1146
Status (2)
2
Department
City Clerk
Meeting Date
11/21/2006
Meeting Time
6:00:00 PM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM #20 <br />CITY OF COLTON <br />AGENDA REPORT <br />FC)P TAF CITU C"T WC11 . MFFTTN(: OF N"VFMRF.R 1.1 WIM <br />TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS <br />FROM: AMER JAKHER, P.E., PW DIRECTOR/CITY ENGINEER <br />SUBJECT: APPROVE RESOLUTION INCREASING THE FISCAL YEAR <br />2006/2007 CAPITAL IMPROVEMENT PROGRAM BUDGET IN THE <br />AMOUNT OF $20,000 AND AUTHORIZE AWARD OF A <br />CONSTRUCTION AGREEMENT FOR THE PRADO PARK <br />PROJECT. <br />DATE: NOVEMBER 14, 2006 <br />BACKGROUND: <br />Storm water runoff and excess irrigation water accumulates at the intersection of Prado <br />Lane and Hidden Valley Lane. This water eventually drains on the surface through Prado <br />Park to a storm drain at the South edge of the park. The surface drainage through Prado <br />Park needs to be put underground to, eliminate standing water and improve park <br />conditions. The Capital Improvement Program was amended March 7, 2006 to include <br />the Prado Park Project. <br />ANALYSIS/DISCUSSION: <br />The Project design calls for installing catch basins in the curb to capture the runoff from <br />Hidden Valley and Prado Lane. Water accumulated at this catch basin will be moved <br />underground through a twelve -inch reinforced concrete pipe and an eighteen -inch high <br />density polyethylene pipe to the south end of Prado Park. <br />In accordance with the City's purchasing ordinance, Section 3.08.050, informal bids were <br />requested from three contractors to complete the scope of work described. Of the three <br />contractors contacted only one responded, Ken Thompson Inc; and the bid received was in <br />the amount of $49,980. Staff requests the award of a construction agreement to Ken <br />Thompson Inc, in the amount of $49,980 for the Prado Park Project. <br />ENVIRONMENTAL IMPACT: <br />The proposed public improvements are exempt under Section 15301 (c) of the California <br />Environmental Quality Act (CEQA). <br />
The URL can be used to link to this page
Your browser does not support the video tag.