My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
(13)AR 121906 Slurry Seal
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2006
>
12/19/2006 6:00 pm
>
CONSENT CALENDAR
>
Notice of Completion
>
(13)AR 121906 Slurry Seal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2014 6:14:25 AM
Creation date
2/19/2014 10:49:39 PM
Metadata
Fields
Template:
Agenda Item
Item Number
11
Subject (2)
- Approve the Contract Change Order of the Project in the Amount of $37,755.59 (9.6% of Contract Amount); Authorize the Execution and Recordation of the Notice of Completion for the Citywide Slurry Seal Project and Slurry Seal Phase VI Project.
Submitted On
12/14/2006
Submitted By
Sabdi Espinoza
Item Title
AR 121906 Slurry Seal
ATRequest
1201
Status (2)
2
Department
City Clerk
Meeting Date
12/19/2006
Meeting Time
6:00:00 PM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM #13 <br />CITY OF COLTON <br />AGENDA REPORT <br />FOR THE CITY COUNCIL MEETING OF DECEMBER 19, 2006 <br />TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS <br />FROM: AMER JAKHER, P.E., PW DIRECTOR/CITY ENGINEER <br />SUBJECT: APPROVE CHANGE ORDER NO.1 FOR THE CITYWIDE <br />SLURRY SEAL PROJECT AND SLURRY SEAL PHASE VI <br />PROJECT, IN THE AMOUNT OF $37,755.59; AUTHORIZE <br />RECORDATION OF THE NOTICE OF COMPLETION FOR THE <br />CITYWIDE SLURRY SEAL PROJECT AND SLURRY SEAL <br />PHASE VI PROJECT. <br />DATE: DECEMBER 11, 2006 <br />BACKGROUND: <br />On July 18, 2006, the City Council authorized the award of Citywide Slurry Seal Project to <br />American Asphalt South, Inc. in the amount of $392,588.65. The project included selected streets <br />within the City of Colton as shown on attached map (Exhibit "A"). The scope of work for this <br />project included sealing cracks along streets with minor damage, then overlaying these streets with <br />slurry seal to perpetuate the life of the existing pavement; street stripping and pavement markings <br />were replaced after the sealing. <br />Streets included on this project were streets which showed signs of pavement stress but were not <br />yet ready for rehabilitation or reconstruction. <br />ANALYSIS/DISCUSSION: <br />American Asphalt South, Inc. completed the project satisfactorily as specified on contract <br />documents, plans, and specification in the amount of $430,344.24. This amount was higher than the <br />contract amount of $392,588.65 as a result of Change Order No. 1 (Exhibit B) requested by the City <br />in the amount of $37,755.59 (9.6% of contract amount). The Change Order added the following <br />streets and parking areas to the scope of the project: <br />1. Valley Blvd — La Cadena Drive to Rail Road <br />2. Valley Blvd. — 3rd Street to Rancho Ave. <br />3. Rancho Ave — Valley Blvd. to F Street. <br />4. Gonzales and Hutton center Parking Area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.