My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
(16)AR 020607 Executed agreement with Southern California Edison
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2007
>
02/06/2007 6:00 pm
>
CONSENT CALENDAR
>
Agreement/Southern California Edison
>
(16)AR 020607 Executed agreement with Southern California Edison
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2014 6:50:12 AM
Creation date
2/19/2014 10:52:59 PM
Metadata
Fields
Template:
Agenda Item
Meeting Date
2/6/2007
Meeting Time
6:00:00 PM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
this Study. Such specifics would be developed pursuant to a later Facilities <br />Study, if applicable. <br />c. Study conditions and assumptions. <br />d. Load flow analysis. <br />e. Post transient voltage analysis. <br />4. Basis for Study: In determining the capacity available, SCE will exclude from <br />capacity proposed to be made available to Colton, capacity to meet (i) its existing <br />contractual obligations, (ii) previous obligations under the terms of the WDAT, (iii) <br />previously pending WDAT applications, if any, and (iv) any other pending <br />applications. <br />5. Assumptions: The Study will be based on the following assumptions: <br />a. Colton is or will be an Eligible Customer under the WDAT with respect to the <br />Project. <br />b. The LM 6000 generating unit and associated machines installed at the Colton <br />generating site in Colton, California remain unchanged from the date the Project <br />was initially interconnected to Colton's distribution system. <br />c. The maximum Distribution Service requested by Colton is 43 MW. <br />d. A targeted date to commence Distribution Service of April 30, 2007; however, <br />such assumption shall be subject to change after Study results, design, and <br />material lead times are known, so that a more accurate determination can be made. <br />e. Distribution Service will be provided from Colton Substation through SCE's <br />Distribution System for delivery of energy to the ISO Grid at SCE's Vista <br />Substation 230 kV bus. <br />f. The technical data supplied by Colton for this Project are accurate and complete. <br />g. The Project will have voltage regulation equipment and generator reactive power <br />capability to maintain a voltage schedule or reactive power schedule and will be <br />capable of operation over a power factor range in accordance with the WDAT. <br />h. No operating restrictions exist other than routine maintenance. <br />i. Projects with applications preceding Colton are assumed in-service; however, <br />potential system enhancements or modifications resulting from such projects, if <br />any, are not assumed. <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.