My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
(15)AR 030607 Baseball Field Lighting Project
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2007
>
03/06/2007 6:00 pm
>
CONSENT CALENDAR
>
Authorization to go out to Bid
>
(15)AR 030607 Baseball Field Lighting Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2014 6:36:31 AM
Creation date
2/19/2014 10:55:14 PM
Metadata
Fields
Template:
Agenda Item
Item Number
14
Subject (2)
- Authorize the Request to Solicit Bids for both the Laurel Street/Paul J. Rogers Elementary School Street Improvements Project and Davis Park Baseball Filed Lighting Project.
Submitted On
3/1/2007
Submitted By
Sabdi Espinoza
Item Title
AR 030607 Baseball Field Lighting Project
ATRequest
1355
Status (2)
2
Department
City Clerk
Meeting Date
3/6/2007
Meeting Time
6:00:00 PM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreement with the County for this Grant was accepted and approved by the City Council on <br />January 17, 2006. <br />DISCUSSION/ANALYSIS: <br />Laurel Street/Dr. Paul J. Rogers Elementary School <br />City staff has prepared the plans and specifications for the Laurel Street Improvement Project and is <br />ready to begin the proceedings for this project. This project will bid improvements which <br />correspond to the Dr. Paul J. Rogers Elementary Improvement Project. The scope of work being <br />bid includes installation of missing concrete curb, gutter, sidewalk, drive approach and handicap <br />ramps. The project limits are as follows and shown in Exhibit A: <br />Laurel Street <br />— Teresa Avenue to Rancho Avenue. <br />Latham Street <br />— Laurel Street to Long Beach Drive. <br />Grand Avenue <br />— Stevenson Street to Long Beach Drive. <br />Tejon Avenue <br />— Laurel Street to cul-de-sac. <br />Elizabeth Davis Park <br />One of the improvements proposed for Elizabeth Davis Park is the replacement of the baseball field <br />lighting system. The existing wood light poles will be replaced by steel poles. We engaged the <br />services of JCA Engineering, Inc. of Highland, California to prepare the plans and specifications for <br />this project. The plans are in the building plan check phase and the project is now ready to begin the <br />bidding process. <br />During the bidding process every attempt will be made by the Public Works/Engineering staff to <br />ensure a wide range of potential bidders are reached. The City will advertise in local newspapers <br />and `plan houses' where contractors can view the Project's plans, specifications and documents; this <br />is the process depicted by the City's purchasing ordinance 0-12-03, Section 3.08.090 (d) and <br />3.08.090 (e). <br />ENVIRONMENTAL IMPACT: <br />Laurel Street/Paul J. Rogers Elementary Street Improvement Project is exempt under CEQA 15301 <br />(c) - Repair of existing streets. The Davis Park Field Lighting project is exempt under CEQA <br />15302 (c) — Replacement of existing utility systems and/or facilities involving negligible or no <br />expansion of capacity. Notice of Exemption for these two (2) projects will be filed to the County. <br />CONFLICT OF INTEREST: <br />None. <br />FINANCIAL IMPACT: <br />The awarded grants from the County of San Bernardino are available in accounts: 450-0617-6987- <br />3890 (Improvements to Elizabeth Davis Park Project) and 450-0706-6986-3890 (Dr. Paul J. Rogers <br />Elementary Improvement Project). <br />
The URL can be used to link to this page
Your browser does not support the video tag.