My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
(14)AR 040307 10th, G St, and Colton Avenue intersection project
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2007
>
04/03/2007 6:00 pm
>
CONSENT CALENDAR
>
Solicitation of Bids
>
(14)AR 040307 10th, G St, and Colton Avenue intersection project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2014 6:16:35 AM
Creation date
2/19/2014 10:57:59 PM
Metadata
Fields
Template:
Agenda Item
Meeting Date
4/3/2007
Meeting Time
6:00:00 PM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM #14 <br />CITY OF COLTON <br />AGENDA REPORT <br />FOR THE CITY COUNCIL M1+:KIINU UY APKIL s, Zuu i <br />TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS <br />FROM: AMER JAKHER, P.E., PW DIRECTOR / CITY ENGINEER <br />SUBJECT: AUTHORIZE REQUEST TO SOLICIT PUBLIC BIDS FOR 10TH <br />STREET/G STREET/COLTON AVENUE INTERSECTION <br />IMPROVEMENT PROJECT <br />DATE: MARCH 22, 2007 <br />BACKGROUND: <br />City staff applied for Article III grant funds in February 2005 to fund the following improvements: <br />1) signalizing the intersection of 10th Street and `G' Street and 2) installing a lighted pedestrian <br />crossing at `C' Street and Colton Avenue. On August 1, 2006, City Council accepted the awarded <br />Article III grant funds, totaling $245,000. In order to mitigate the drainage problem at the project <br />location, installation of a storm drain was added to the scope of this project. <br />The proposed improvement will extend 10th Street to intersect with the G Street/Colton Avenue <br />intersection. The 10h Street /G Street and Colton Avenue intersection currently exists as a "4 way <br />STOP," where 10th Street runs north and south connecting to G Street on the south side only. At <br />this intersection 10th Street terminates in the northern direction before it reaches G Street/Colton <br />Avenue intersection (see Exhibit A). <br />ANALYSIS/DISCUSSION: <br />The design of this project was awarded to Fraco Enterprises, Inc. The consultant, in collaboration <br />with staff, has completed the plans, specifications, and construction cost estimate for this project. <br />This project is now ready to begin the bidding process. Every attempt will be made by the Public <br />Works/Engineering staff to ensure a wide range of potential bidders are reached through the <br />advertisement process. The City will advertise in local newspapers and `plan houses,' where <br />contractors can view the Project's plans, specifications and documents. This advertisement meets <br />the purchasing requirements for a public project depicted by the City's purchasing ordinance 0-12- <br />03, Section 3.08.090 (d) and 3.08.090 (e). <br />
The URL can be used to link to this page
Your browser does not support the video tag.