Laserfiche WebLink
EXHIBIT A-3 <br />COST PER UNIT <br />"Unit of Construction"- The maximum amount of material and labor required to rehabilitate the <br />improvement specified in the Scope of Improvements identified in the Plans and Specifications as <br />required specific to the level of deterioration when rehabilitation commences. <br />The Cost per Unit of a standard lot shall not exceed $1,625. <br />