My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
(13)AR 090407 Fairway Drive Widening Project
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2007
>
09/04/2007 6:00 pm
>
CONSENT CALENDAR
>
Change Order
>
(13)AR 090407 Fairway Drive Widening Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2014 6:08:21 AM
Creation date
2/19/2014 11:13:33 PM
Metadata
Fields
Template:
Agenda Item
Item Number
10
Subject (2)
- Authorize the Award of Optional Bid Item VII (Fairway Drive Widening Project) as Change Order No. 2 for the CDBG Project 104-31105 and 104-31305, in the Amount of $41,637.48.
Submitted On
8/30/2007
Submitted By
Sabdi Espinoza
Item Title
AR 090407 Fairway Drive Widening Project
ATRequest
1684
Status (2)
2
Department
City Clerk
Meeting Date
9/4/2007
Meeting Time
6:00:00 PM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM #13 <br />CITY OF COLTON <br />AGENDA REPORT <br />FOR THE CITY COUNCIL MEETING OF SEPTEMBER 4, 2007 <br />TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS <br />FROM: AMER JAKHER, P.E., PW DIRECTOR/CITY ENGINEER <br />SUBJECT: AWARD OPTIONAL BID ITEM VII (FAIRWAY DRIVE <br />WIDENING PROJECT) AS CHANGE ORDER NO.2 FOR CDBG <br />PROJECT #104-31105 AND 104-31305 IN THE AMOUNT OF <br />$41,637.48. <br />DATE: AUGUST 13, 2007 <br />BACKGROUND: <br />On September 19, 2006, a construction contract was awarded by Council for the following capital <br />projects: CDBG Project #104-31105/2765, CDBG Project #104-31305/2767, Safe Route to <br />School Project, Rancho Mill Redevelopment Projects, and Carreon Street Closure Project. The <br />construction agreement was awarded to the lowest responsive and responsible bidder to Portsmouth <br />Construction, in the amount of $676,566.10. Subsequently, on June 5, 2007 Council authorized <br />staff to award a change order to the contractor in the amount of $45,880.02. The compensation <br />reflected by the contract and change order totaled $722,446.12; the change order was resulted <br />from design changes required to install the project improvements. <br />The locations and specific improvements provided by each project are as follows: <br />I. CDBG Project <br />A. CDBG Project #104-31105/2765 — Installation of missing curb, gutter, <br />sidewalk, driveway approach and handicap ramps on Redlands Avenue (Olive <br />to Laurel Street), Lemon Street (Redlands to Mt. Vernon Avenue), Laurel <br />Avenue (Olive to Laurel Street), 10th Street (Olive to B Street), 12th Street (`C` <br />to `A' Street)., and B Street (10th Street to Colton Avenue). <br />B. CDBG Project #104-31305/2767 - Installation of missing curb, gutter, <br />sidewalk, and handicap ramps on Olive Street (Bordwell to La Cadena), <br />Bordwell (La Cadena to Olive), 9th Street (Olive to La Cadena), and 10th Street <br />(Olive to La Cadena). <br />11. Safe Route to School Project — Installation of missing curb, gutter, sidewalk, handicap <br />ramps, block wall, alley and driveway approach on Terrace Avenue (between C Street <br />and Olive Street) and Olive Avenue (between Pennsylvania Avenue and Rancho <br />Avenue). <br />
The URL can be used to link to this page
Your browser does not support the video tag.