Laserfiche WebLink
SHORT -FORM CONSTRUCTION CONTRACT <br />FOR CHIAN LINK FENCE AT PD IMPOUND YARD EXPANSION PROJECT IN CITY OF COLTON <br />Parties and Date <br />This Contract is made and entered into this 4th day of December, 2007 by and <br />between the City of Colton, a municipal corporation ("City") and Ross Fence Company, Inc. <br />("Contractor"). <br />2. Recitals <br />2.1 City is a municipal corporation organized under the laws of the State of California, <br />with power to contract for services necessary to achieve its purpose. <br />2.2 Contractor is a professional contractor, experienced in providing CHAIN LINK <br />FENCE AND TUBULAR STEEL GATE INSTALLATION services and is familiar with the plans <br />of the City. <br />2.3 City desires to engage Contractor to INSTALL REMOVE 227 FEET OF EXISTING <br />FENCE AND RELOCATE AND INSTALL 200 FEET OF NEW CHAIN LINK FENCE AND <br />TUBULAR STEEL WALK IN AND SLIDING GATE AT PD IMPOUND YARD EXPASNSION <br />PROJECT as set forth herein. <br />2.4 Contractor has obtained, and delivers concurrently herewith, INSURANCE <br />DOCUMENTS AND OTHER CERTIFICATIONS as required by the Contract. <br />Terms <br />3.1 Incorporation of Documents. This Contract includes and hereby incorporates in full <br />by reference the following documents, including all exhibits, drawings, specifications and documents <br />therein, and attachments and addenda thereto: Exhibit A, B and C <br />3.2 Contractor's Basic Obligation; Scope of Work. Contractor promises and agrees, at its <br />own cost and expense, to furnish to the Owner all labor, materials, tools, equipment, services, and <br />incidental and customary work necessary to fully and adequately complete the INSTALLATION <br />AND RELOCATION OF CHAIN LINK FENCE AND INSTALLATION OF WALK IN AND <br />SLIDING GATE AT PD IMPOUND YARD EXPANSION Project, including all structures and <br />(BB&K: revised July 2, 2001) <br />