My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
(5)AR 052008 McKinley Park Project
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2008
>
05/22/2008 06:00 PM
>
CONSENT CALENDAR:
>
Bid/Prado and McKinley Park Project
>
(5)AR 052008 McKinley Park Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2014 5:18:42 PM
Creation date
2/19/2014 11:36:21 PM
Metadata
Fields
Template:
Agenda Item
Item Number
5
Subject (2)
- Authorize Rejection of All Received Bids and Approve Authorization to Solicit New Bid for Prado and Mckinley Park Project.
Submitted On
5/15/2008
Submitted By
Sabdi Espinoza
Item Title
AR 052008 McKinley Park Project
ATRequest
2205
Status (2)
2
Department
City Clerk
Meeting Date
5/22/2008
Meeting Time
6:00:00 PM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF COLTON <br />AGENDA REPORT <br />FOR COUNCIL MEETING OF MAY 20, 2008 <br />TO: HONORABLE MAYOR AND CITY COUNCIL <br />FROM: MARITZA TAPIA, INTERIM PUBLIC WORKS DIRECTOR <br />SUBJECT: REJECT ALL BIDS AND AUTHORIZE TO JOINTLY REBID THE <br />MCKINLEY PARK IMPROVEMENT PROJECT AND THE PRADO <br />PARK IMPROVEMENT PROJECT. <br />DATE: <br />BACKGROUND: <br />MAY 8, 2008 <br />McKinley Park is located on a property owned by the Colton Joint Unified School District along <br />Johnston Street. The City and School District have executed a Joint Use Agreement for Facility <br />Use; this agreement was originally executed on May 18, 2000 and amended extending the term of <br />the Agreement on November 15, 2007. The 2007/2008 Capital Improvement Program identifies <br />the McKinley Park Improvement Project will provide for the following improvements: asphalt <br />overlay of existing parking, asphalt overlay on basketball court, striping, provide handicap <br />accessible concrete walkways, replace existing safety surfacing mat, installation of concrete pad <br />for bleachers, and shade structures. <br />Improvements to Prado Park are also identified in the 2007/2008 Capital Improvement Program <br />(CIP) as the Prado Park Improvement Project. This park is located along Prado Lane in Reche <br />Canyon. The Prado Park Improvement Project will address the following needed improvements: <br />installation of playground equipment and safety surfacing mat, installation of handicap accessible <br />concrete walkways, installation 18' Gazebo, and two (2) picnic tables with concrete pads. <br />DISCUSSION/ANALYSIS: <br />On April 1, 2008, the City Council authorized the joint solicitation of bids for the McKinley Park <br />Improvement Project and the Prado Park Improvement Project. Advertisement of the project <br />started on April 4, 2008 and bids were opened on May 1, 2008. City received bids from six (6) <br />different contractors. The received bids were as follows: <br />1. International Pavement Solutions <br />2. Braughton Construction <br />3. Micon Constuction Inc. <br />4. Malibu Pacific <br />5. C.S. Legacy Construction <br />6. Fleming Environmental <br />7/10/03 City Clerk's Office Cb <br />$201,712.60 <br />$276,689.00 <br />$283,471.82 <br />$289,788.00 <br />$292,472.00 <br />$328,989.50 <br />ITEM #5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.