My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
(4)AR 020309 Chrisp Company
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2009
>
02/03/2009 6:00 pm
>
CONSENT CALENDAR:
>
Award of Contract/Chrisp Company
>
(4)AR 020309 Chrisp Company
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2014 4:54:34 PM
Creation date
2/20/2014 12:06:11 AM
Metadata
Fields
Template:
Agenda Item
Item Number
4
Subject (2)
- Authorize Award of Construction Contract to the Lowest Responsible Bidder, Chrisp Company in the Amount of $75,000.00 for the Citywide Striping Project.
Submitted On
1/29/2009
Submitted By
Sabdi Espinoza
Item Title
AR 020309 Chrisp Company
ATRequest
2608
Status (2)
2
Department
City Clerk
Meeting Date
2/3/2009
Meeting Time
6:00:00 PM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM #4 <br />CITY OF COLTON <br />AGENDA REPORT <br />FOR COUNCIL MEETING OF FEBRUARY 3, 2009 <br />TO: HONORABLE MAYOR AND CITY COUNCIL <br />FROM: MARITZA TAPIA, INTERIM PUBLIC WORKS DIRECTOR <br />SUBJECT: AUTHORIZE THE AWARD OF A CONSTRUCTION <br />CONTRACT FOR THE CITY WIDE STRIPPING PROJECT TO <br />CHRISP COMPANY., IN THE AMOUNT OF $75,000. <br />DATE: JANUARY 26, 2009 <br />BACKGROUND: <br />On December 12, 2008, the Public Works Department staff solicited bids for the City Wide <br />Stripping Project. Public Works staff has identified the following streets for this project: <br />1. Rancho Ave from Louise Street to Olive Street <br />2. Rancho Ave from Valley Blvd to La Cadena Dr <br />3. La Cadena Dr from Citrus St to I-10 <br />4. La Cadena Dr from 1-10 to I-91 <br />5. Valley Blvd from City limit to RR track <br />6. Mt. Vernon Ave from Valley Blvd to Olive PI <br />7. Washington St from I-215 ramp to Cooley Dr <br />8. Barton Rd from Cooley Dr to Waterman Ave <br />9. Reche Canyon from Barton Rd to South City Limits <br />Exhibit A of this report identifies the above locations. The project scope includes installation of the <br />following traffic legends: broken white line, broken white line 45 mph or more, double solid yellow <br />line, two way left turn at centerline, single yellow line, edge solid white line, channeling solid white <br />line on left turns, 6" bike lane white, bike lane intersection line, crosswalk with two line <br />perpendicular to the traffic flow, crosswalk with white longitudinal lines parallel to traffic flow, <br />diagonal and chevron markings, white stop lines, white arrow, left turn arrow, left turn arrow, right <br />turn arrow, turn arrow and through lane arrow, signal ahead, stop sign, speed limit, RR crossing, <br />and bike lane legends. <br />DISCUSSION/ANALYSIS: <br />The public bidding of this project was advertised in local papers and trade journals beginning on <br />December 08, 2008. The bid opening was conducted on January 15, 2009 and staff received formal <br />proposals from four (4) firms, with their corresponding bid amounts as follows: <br />7/10/03 City Clerk's Office Cb <br />
The URL can be used to link to this page
Your browser does not support the video tag.