My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
(15)AR 061609 CUA/SSMP
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2009
>
06/16/2009 6:00 pm
>
CONSENT CALENDAR:
>
CUA/SSMP
>
(15)AR 061609 CUA/SSMP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2014 6:41:42 AM
Creation date
2/20/2014 12:21:42 AM
Metadata
Fields
Template:
Agenda Item
Item Number
15
Subject (2)
- Approve and Adopt Resolution Adopting the City of Colton Sewer System Management Plan (SSMP) and that the Colton Utility Authority Board Review, Ratify and to the Extent Necessary, Direct that the City Council take the Above Action(s), RESOLUTION NO. R-39-09.
Submitted On
6/11/2009
Submitted By
Sabdi Espinoza
Item Title
AR 061609 CUA/SSMP
ATRequest
2828
Status (2)
2
Department
City Clerk
Meeting Date
6/16/2009
Meeting Time
6:00:00 PM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sewer System Management Plan <br />City of Colton <br />6.3.1 Staff Instructions.........................................................................................6-3 <br />6.3.2 First Responder Duties and Responsibilities..............................................6-5 <br />6.3.3 SSO Response Field Supervisor.................................................................6-5 <br />6.3.4 Wastewater Reclamation Manager.............................................................6-5 <br />6.3.5 Environmental Compliance Services..........................................................6-6 <br />6.4 Initial Notification Procedures................................................................................... <br />6-6 <br />6.4.1 Emergency Call Out Lists...........................................................................6-6 <br />6.5 Assessment, Containment, Traffic Control and Clean-up ..................................... <br />6-10 <br />6.5.1 Preliminary Assessment of Damage to Private/Public Property ..............6-10 <br />6.5.2 Containment..............................................................................................6-10 <br />6.5.3 Traffic and Crowd Control.......................................................................6-10 <br />6.5.4 Initial Estimates of Flow Volume.............................................................6-11 <br />6.5.5 Additional Measures for Prolonged SSO Conditions...............................6-19 <br />6.5.6 Clean-up....................................................................................................6-19 <br />6.5.7 Monitoring................................................................................................6-19 <br />6.6 Private Property SSOs.............................................................................................. <br />6-20 <br />6.7 SSO Reporting.......................................................................................................... <br />6-20 <br />6.8 Regulatory Agency Notification Plan ..................................................................... <br />6-21 <br />6.8.1 Initial Notification....................................................................................6-21 <br />6.8.2 Secondary Notification.............................................................................6-24 <br />6.8.3 Electronic Reporting Procedures..............................................................6-24 <br />6.8.4 Spill Report Debriefing............................................................................6-27 <br />6.9 Collection System Mapping..................................................................................... 6-27 <br />6.10 Training..................................................................................................................... 6-32 <br />6.11 Public Advisory Procedure...................................................................................... 6-32 <br />6.11.1 Temporary Signage...................................................................................6-32 <br />6.12 SSO Plan Maintenance............................................................................................. 6-34 <br />6.12.1 Submittal and Availability of the SSO Plan .............................................6-34 <br />6.12.2 Review and Update of SSO Plan..............................................................6-34 <br />6.13 Tracking SSOs.......................................................................................................... 6-34 <br />7.0 FATS, OILS, AND GREASE CONTROL PROGRAM ...................................... 7-1 <br />7.1 Background.................................................................................................................7-1 <br />7.2 FOG Program Elements............................................................................................. 7-3 <br />7.3 Site Inspections........................................................................................................... 7-4 <br />7.4 Public Education and Outreach.................................................................................. 7-6 <br />7.4.1 Sample BMP Posters for Food Service Establishments.............................7-7 <br />7.4.2 Commercial Grease Interceptor Requirements...........................................7-8 <br />7.5 Plan Check Inspections.............................................................................................. 7-9 <br />7.6 Best Management Practices..................................................................................... 7-10 <br />7.6.1 Food Prep Area BMPs..............................................................................7-10 <br />7.6.2 Interceptor and Grease Trap Maintenance BMPs.....................................7-11 <br />7.7 Sewer Line Cleaning and Assessments................................................................... 7-12 <br />7.8 Sewer and Lateral CCTV Inspections..................................................................... 7-13 <br />7.9 Enforcement..............................................................................................................7-13 <br />7.10 Grease Interceptor Retro Fits................................................................................... 7-14 <br />7.11 Training..................................................................................................................... 7-16 <br />City of Colton SSMP II June 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.