My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
(3)AR 121509 Environmental Addendum
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2009
>
12/15/2009 6:00 pm
>
PUBLIC HEARINGS:
>
Environmental Addendum
>
TIME AND PLACE FIXED TO CONSIDER AND APPROVE A RESOLUTION ADOPTING THE ADDENDUM TO THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE AGUA MANSA COMMERCE CENTER PURSUANT TO THE CALIFORNIA ENVIRONMENTAL QUALITY ACT IN RESPONSE TO THE SUPERIOR COURT OF SAN BERNA
>
(3)AR 121509 Environmental Addendum
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2014 4:44:16 PM
Creation date
2/20/2014 12:37:12 AM
Metadata
Fields
Template:
Agenda Item
Item Number
1
Submitted On
12/10/2009
Submitted By
Sabdi Espinoza
Item Title
AR 121509 Environmental Addendum
ATRequest
3202
Status (2)
2
Department
City Clerk
Meeting Date
12/15/2009
Meeting Time
6:00:00 PM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Associates added the calculated Project traffic to the EVTM traffic counts, <br />effectively counting the Project traffic twice. Additionally, 100% of the <br />Project traffic volumes are added to the traffic calculation beginning in the <br />Opening Year. However, it is anticipated that the Project will be built out <br />over several years, currently estimated to extend into Year 2011. <br />Therefore, assuming that 100% of the volume of the Project traffic will <br />begin in year one, rather than gradually increasing over several years, <br />represents a worst case scenario. <br />Calculation of Year 2030 ADT Volume: (See Exhibit B for a numerical <br />calculation of the steps described below.) <br />1-3) The first three steps for calculating Year 2030 ADTs are the same as those <br />above for calculating Opening Year ADTs. <br />4) This is not a required step for calculating Year 2030 estimated ADTs <br />because the 10% minimum increase only applies to the Opening Year <br />ADTs. <br />5) The fifth step for calculating Year 2030 ADTs is the same as step 5 above <br />for calculating Opening Year ADTs. <br />6) Sixth, Annual Growth is added per the EVTM to future years to arrive at <br />the projected Year 2030 ADT volume. <br />Exhibit B illustrates the methodology above using figures (both eastbound and <br />westbound) from Agua Mansa Road immediately north of El Rivino Rd. <br />In summary, the methodology used begins with existing traffic in 2007, adds <br />Annual Growth per the EVTM and finally adds Project traffic starting in Opening Year <br />2009. The combination of these three components results in the estimated 2030 traffic <br />volume. <br />3. SANBAG's Valley Signal Synchronization Program <br />SANBAG's Valley Signal Synchronization Program (also known as the SB <br />Valley Coordinated Traffic Signal System Plan) is a strategic plan for interconnecting <br />and coordinating traffic signals on major streets in the San Bernardino Valley area across <br />several jurisdictional boundaries. Four phases, or tiers, were recommended for <br />implementation of the program. Tiers 1 and 2 have been completed. Tiers 3 and 4 are <br />completely funded and scheduled. The funding source for Tiers 3 and 4 is the <br />Congestion Mitigation and Air Quality (CMAQ) funds. (SANBAG website <br />(http://www.sanbag.ca.gov /planning/subr traffic-signal.html); May 20, 2009 SANBAG <br />Minute Action, Agenda Item 3; and 2008 Traffic Light Synchronization Program Project <br />Scope, Cost, Schedule and Benefit Baseline Agreement between SANBAG and <br />California Department of Transportation.) Attached as Exhibit E is the May 20, 2009 <br />wc-141612 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.