My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1993 AGN APR 20 I07_Contract Award Street Repair
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1993
>
1993 April 20 Agenda Packet
>
1993 AGN APR 20 I07_Contract Award Street Repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 1:20:16 PM
Creation date
2/20/2014 1:12:05 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINANCIAL IMPACT <br />The total cost of performing all repair work is: <br />1. Hydrowashing Storm Drain $13,140.00 <br />2. Video Inspection of Storm Drain $ 540.00 <br />3. Repairing street drainage S20.351.28 <br />Total Cost of Work $34,031.28 <br />The funding will come from current Public Works Street Maintenance <br />Division Fund (01-4005-40). Staff will make every effort to <br />recover portion of costs through possible Storm Damage <br />Reimbursement Funds from the Federal Emergency Management Agency <br />(FEMA) as this damage was caused by the recent storms. <br />Staff recommends thatouncil authorize this emergency expenditure <br />and award the cgptactto Kentco Engineering. <br />Manager's <br />Report prepared by James King, <br />Engineering Specialist <br />D2:KENTCO <br />
The URL can be used to link to this page
Your browser does not support the video tag.