My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1993 AGN JUN 15 I06
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1993
>
1993 June 15 Agenda Packet
>
1993 AGN JUN 15 I06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 1:18:54 PM
Creation date
2/20/2014 1:09:01 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF COLTON <br />AGENDA REPORT <br />For Council Meeting of June 15, 1993 <br />TO: Honorable Mayor and City Council <br />FROM Robert A. Lavin, Water Utilities Manager <br />SUBJECT: Award <br />of Contract for Olive Street <br />Water Improvements, Project NO. PU93-2 Date: June 8 <br />to El -Co Contractors in the , 1993 <br />----- Amount of $126 477.40 <br />BACKS ND : <br />The Olive Street water line being replaced is a 6" <br />trai <br />installed in 1926. The transmission line needs to berepla ed and n line which was <br />line in order to accommodate the new construction west of the railroad ad <br />upgraded s. a 12" <br />DISCUSSION: <br />The <br />tracks. <br />The Public Utilities received 8 bids on June 7 for the repla eme <br />Olive Street water line. Attached is the bid analysis hi shows a bid alternative <br />for C900 PVC nt and upgrade of the <br />longer install C900 PVC waterwater llines within the f is oCity ot <br />However, staff is recommending that the City not <br />savings 89 minimal. Sufficient funds exist in the Water Lin Replacement a the <br />21-9924-89, water system since the cost <br />Account No. <br />RECOMMENDATION: <br />Staff recommends that Council award the Olive Street Wate <br />Improvements to E1 -Co <br />Contractors in the amount of $126,477.40. <br />LJ/lj <br />CITY MANAGER'S CONCURRENCE: <br />Attachments: <br />Page 1 of <br />Item No.—J�—_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.