My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1993 AGN MAY 04 I14
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1993
>
1993 May 04 Agenda Packet
>
1993 AGN MAY 04 I14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2014 4:52:22 PM
Creation date
2/20/2014 1:11:47 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF COLTON <br />AGENDA REPORT <br />For Council Meeting of May 4, 1993 <br />T0: Honorable May a�n+dyCitgwcil <br />FROM: °azar -E•, Dayxer,/rPu�blic Utilities Director <br />SUBJECT: Award of /Contract for Reconstruction Date: April 27, 1993 <br />of Sewer Line in Mt. Vernon Ave. to <br />Insituform in the Amount of $88,550.00 <br />The sewer lines located in the east side of town are deteriorating and in need of major <br />repairs. The sewer lines are about fifty years old and made of non -reinforced <br />concrete. Television inspection of the subject sewer line shows a serious possibility <br />of collapse. Such occurrences could result in a significant traffic accident on this <br />heavily traveled street. <br />Staff has researched several alternatives for repairing/replacing of sewer mains and <br />the needed traffic control for the alternatives. The Insituform process requires no <br />excavation, except in areas where the line is totally collapsed. The Insituform <br />process also requires little disruption in traffic flow since the streets are not being <br />excavated. <br />DISCUSSION: <br />On March S. 1993 open bids were received for the reconstruction of the sewer line in <br />Mt. Vernon Ave. One bid was received from Insituform in the amount of $88,550.00. <br />Staff has reviewed the bid and recommends the contract award. Insituform has <br />successfully done previous sewer line repairs for the City. <br />FINANCIAL IMPACT• <br />Sufficient funds have been budgeted in the FY92-93 budget for sewer line repairs. <br />Staff recommends that Council award the reconstruction of the Mt. Vernon Ave. sewer <br />line to Insituform in the amount of $88,550.00. <br />/lj <br />l <br />CITY MANAGER'S CONCURRENCE: <br />Attachments. <br />Page t of <br />Item No. • 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.