Laserfiche WebLink
MAY -2-2-1996 12:11 FROM CITY OF COLTON RDA <br />TO CITY MANAGER P.11 <br />Reserve Analysis <br />HSON /MaCt <br />Contributions ftftreplaomuma of0ty 11M Vehicles and equipmeon"d1l MICUMtDbe <br />&aWd to user AmdS. ToW replacement costs included in 1he FY 1994-95 budget equals <br />S%4.OW. <br />C�upiW Equ4mmW Rept"Ment RMWM <br />cdy CAp=d Fgsad Pohcy: Ivisintam a Capital Equipment Replaoment sehodult and maintain <br />adequate roomy= to Amd. it. <br />To date, only ftd vehicles have been set up on a replaommt Schedule. Funding wS3 Allocated <br />in FY 1994-95 for a full capital assets invmtory, which will be conduftd in this ftud yew and <br />wiH We=fy andtatolog all Gentral Fund asoots and establish a ropkoevw= schedule ibr these <br />assets. I <br />Until that study is completed, a precise determination can not be made ragording fuhm neadL <br />However, $100,= was Alocated In PY 1994-93 to ft now CAPW EqUIPMew 910018010004 <br />Reserve Pund a a madt ofrecanunandations contained In the 1994 LTFP. VrAWn do $100,000 <br />allocaW to the fund. $30,000 %vas allocated for the capital assets brm=7. <br />Recommendation <br />i. Eaamih a Capitat Equipment Rcpbcwww schedult and conftft funding ft Capital <br />Equipment Ramve; Fund at $100,000 amuolly. <br />r��" �771 L7 <br />An allocWon of $100,000 was butigged in FY 1904-95. 1U Finmial Forecast has <br />inootporated an annual allocation of $100,000 in each yew of the five you fiMUWW fimeMOL <br />10 <br />