Laserfiche WebLink
SAN BERNARDINO ASSOCIATED GOVERNMENTS <br />REGIONAL TRANSPORTATION IMPROVEMENT PROGRAM <br />SUBMITTAL FORM <br />1998-2005 <br />Revised 3/19197 <br />YEAR $ IN $1000' S <br />1997-1998 <br />San Bernardino Avenue from Pepper Avenue to Meridian Avenue <br />Reconstruct and widen from two to four lanes 1300 L.F. $380 <br />Meridian Street from San Bernardino Avenue to Valley Blvd. <br />Reconstruct and widen to 3 lanes 2000 L.F. $599 <br />"M" Street from 6th to Congress <br />Rehabilitation of streets and add curb and gutter/sidewalk (no new lanes) $ 104 <br />Colton Avenue from Mt. Vernon to City Limits North <br />Widen road from 2 lanes to 4 lanes $255 <br />La Cadena Drive from Valley Blvd, to Mt. Vernon Avenue. <br />Traffic Signal Interconnect $243 <br />Mt. Vernon Avenue at Santa Ana River and Southern Pacific Railroad' <br />Seismic Retrofit $150 <br />PepperAvenue 1-10 to Randall <br />Widen and Rehabilitation $312 <br />City Wide Bike Lane System (without Agua Mansa Road) <br />Signing, striping and some paving rehabilitation <br />Reche Canyon Road (Washington Street to City Limits) <br />Signing, striping and some paving rehabilitation <br />1998-1999 <br />Pepper Avenue - N. City Limits to Valley Blvd. <br />Reconstruct and widen <br />Construction $ 1678 ROW $ 1122 <br />1 <br />$120 <br />$1,301 <br />$2800 <br />