My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1997 AGN FEB 18 I14
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1997
>
1997 February 18 Agenda Packet
>
1997 AGN FEB 18 I14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2014 1:29:44 AM
Creation date
2/20/2014 5:34:14 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GTSASSOCIA TES INC. <br />MAN,4GEWE'N7'- ENGINEERING -,1RU1177:'C7U/?E- PLANNING <br />f635 COUNTRY CLUB DRIVE, REDLANDS. CA 92277 (909) 797.4693 FAX (909; 792.3052 <br />3772 No. E, SrpEEr, SuirE A, SAN 06RNARDINC. CA 92405 (909) 824-3199 FAX (909) 797.3462 <br />DATE' FIL F.. 8000001-cil.(lou <br />TO: Daryl P,-In-ish- ASS'ISICIM C6, Ivianagei- City of Colton <br />FRO,41: Tim R Wilson. P,E.. A I A_ Colion1tv EnLl 'neer's Office <br />C, <br />SUBJECT.- Reche',Qmyon Road Impi-oveillems by the County of San Be_r_n_Fr�mFo <br />The County of San Bernardino is prclrn,rirrg to install street paving and drainage <br />improvements to Reche Conyoil Banns Road North to the City of Colto"n, City <br />limits near Phicid Line. 1-1:u: tic"11.1" :10y.11tion is given to Prado Lane which is to receive a <br />left turn Illie, a si-11:11 nild to the imme(finte south Neill be drainage piping. I spoke today <br />with tile County of snit Berilm-dino Project Development Design Division Chief, Tony <br />Gray who bas informed the of the project progress and schedule as follows: <br />* Advertise ni en t ol'the Project will be ri-oll, February to March <br />0 A Bid opening is proposed in Morch <br />0 The Project is to begin construction in late IM.ly of 1997. <br />0 Duration of the project is ,lpp1-oxilll;l(ely 3 111011ths <br />The above schedule is contingent upon the City of Colton having completed the required <br />waterline modifications by late April, 1997 <br />Please call us if you have any questions. <br />CC; File <br />F <br />
The URL can be used to link to this page
Your browser does not support the video tag.