Laserfiche WebLink
CITY OF COLTON. <br />AGENDA REPORT <br />FOR COUNCIL MEETING OF FEBRUARY 18,1997 <br />SUBJECT: REPORT ON WATER PRESSURE SITUATION IN RECHE CANYON <br />Alternative No. 2 <br />The City would install the pressure regulators in the water meter box. This would require the installation of a <br />larger water meter box, the removal and replacement of sidewalks and the re -plumbing of the customer <br />service in order to accommodate the larger water meter box. In addition, there would be extensive work and <br />restoration around sidewalks adding t0 the cost of this alternative. We estimate each Service to cost <br />approximately $450. <br />Alternative No. 3 <br />The City would install pressure regulators on water mains. This option is very expensive, and would require <br />a modification of the Water MasterPlan. This alternative would impact fire flows and pressures in adjacent <br />zones. The total cost is difficult to estimate without an in-depth engineering study. Our best guess at this -, <br />time would be in excess of $150,000. <br />RECOMMENDATION: <br />There is no staff recommendation, since the problem exists on the customer side of the water meter. <br />1 <br />; <br />Attachment: Resolution No. 3805 - Customer Service Policy Water Rule No. 11 <br />Cc: Mayor and Council -� <br />City Manager <br />Assistant City Manager <br />City Attorney <br />Page 2 of 2 Item N0. <br />r <br />E:: <br />