My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1997 AGN MAR 04 I13
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1997
>
1997 March 04 Agenda Packet
>
1997 AGN MAR 04 I13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 4:21:22 PM
Creation date
2/20/2014 5:33:25 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF COLTON <br />AGENDA REPORT <br />Council Meeting of March 4, 1997 <br />TO: Honorable Mayor and Council Members <br />FROM: Daryl I Parrish, Assistant City Manager UP <br />Purchase of Easement From Southern Pacific Transportation <br />Company for the Regional Project 3-5 Storm Drain <br />DATE: February 26, 1997 <br />BACKGROUND: <br />In the fall of last year the City of Calton Electric Utility purchased a duct bank easement <br />(with the Council's approval) from the Southern Pacific Transportation Company that <br />was necessary to run an electrical line from the new substation to the County Medical <br />Center currently under construction. The cost established by Southern Pacific for this <br />easement was $1.50 per square foot. In order to avoid future delays in designing and <br />eventually constructing the Regional Project 3-5 Storm Drain, we must obtain an <br />easement from Southern Pacific for the proposed Storm Drain that will be immediately <br />adjacent to the aforementioned electrical line. <br />DISCUSSION: <br />Recently, our office requested that our consultant, Engineering Resources contact <br />Southern Pacific and request a written proposal for the cost of the necessary <br />easement. Attached is the response received outlining the cost of the proposed <br />easement which in effect is identical to the price paid for the easement obtained for the <br />electrical line last year, or $1.50 per square foot. The total cost for the proposed <br />easement includes a three month temporary construction easement and is equal to <br />$89,700. <br />FISCAL IMPACT: <br />Funding for this easement is available in the "Storm Drain South of 1-10 Capital <br />Improvement Fund" (Established by the Medical Center MOU) Account Number 754- <br />6850-6859-3890 in the amount of $89,700. <br />OD� <br />Daryl J. Parrish, Assistant City Manager <br />RECOMMENDATION: <br />Staff recommends that the City Council approve the purchase of the aforementioned <br />easement for the proposed Regional Project 3-5 Storm Drain. <br />Attachment (1) Proposal From Southern Pacific Transportation Company <br />Item No. 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.