My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1997 AGN MAY 06 I07
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1997
>
1997 May 06 Agenda Packet
>
1997 AGN MAY 06 I07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 10:55:28 PM
Creation date
2/20/2014 5:34:59 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KRIEGFR <br />l� W,kQ i NC0RP0RAiE 0 <br />MEMORANDUM <br />TO: LORRAINE JUNE I I FILE: 312-45.2 <br />WATER AND WASTEWATER ADMINISTRATIVE ANALYST <br />FROM: MARK E. MESSERSMITH " C -t -i DATE: 4/18/96 <br />KRIEGER & STEWART, INCORPORATED <br />SUBJECT: 1996/1997 CAPITAL IMPROVEMENT PROJECTS <br />As requested, we have prepared recommendations for capital improvement projects for 1996/1997. <br />Since we are in the initial stages of preparing the City's 1996 Water Master Plan, our <br />recommendations are based on City staff comments and our review of the existing facilities. As <br />the 1996 Water Master Plan is developed, some or all of the proposed projects could be modified <br />or revised. The recommended 1996/1997 Capital Improvement Projects are as follows: <br />1. Well Pumping Plant <br />Drill and equip one well at the City's existing site southerly of the intersection of La <br />Cadena Drive and La Loma Avenue. Said well would be designed to pump into the <br />Central Zone. The estimated project cost for the plant is $625,000 as shown below: <br />Description Amount <br />Well (16" dia, 1200' deep) $225,000 <br />Well Pumping Plant (2000 gpm, 450 hp pumping unit) $210,000 <br />Sub -total $435,000 <br />Construction Contingency at 20% $87,000 <br />Construction Total $522,000 <br />Administration, Legal, and Engineering Expenses at 20% $104,000 <br />Total $626,000 <br />Project Total (Rounded) $625,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.