My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1998 AGN JUN 16 I25A
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1998
>
1998 June 16 Agenda Packet
>
1998 AGN JUN 16 I25A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 10:18:58 PM
Creation date
2/20/2014 2:13:26 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUN -15-98 MOM 07:4Z PM <-4 t s . r ped I ands '94979 23852 P.04 <br />DETAIL. ESTIMATE <br />File; 06 -M -0 -COL <br />To be used as a basis of agrcemcnt for Federal -Aid Proicct #4 08 -SU -0 -COL: STPL-5065 (003) <br />in tho City of Colton on North La Cadena • VAlley Blvd, to Mt. Vcrnon in the County of San Bcmardino- <br />7 <br />Construction Authorization data: X3ocomber Xj 1992 <br />Type: Signalization y •�`� <br />Preliminary Engineering (Authonzation date): March 2, 1995 <br />Code: Traff'tc Signal -T031 <br />Item Estimate <br />Item <br />No. <br />Item Description <br />Unit <br />Quantity <br />Unit Price <br />Amount <br />1 <br />Mobilization <br />L.S. <br />1 <br />$2,000.00 <br />S2,000.00 <br />Z <br />'traffic Control <br />L.S. <br />i <br />$4,500.00 <br />54,500.00 <br />3 <br />Install K Head/Hardware <br />�a. <br />12 <br />$3,500.00 <br />542,000.00 <br />4 <br />install interface unit <br />Ea <br />7 <br />$4,000.00 <br />$28,000.00 <br />S <br />install RF Rapeator Interface <br />L.S. <br />1 <br />$8,000.00 <br />$$,000.00 <br />6 <br />interconnect Cablo (3 pair) <br />L -F. <br />650 <br />$4.00 <br />$0 <br />760.00 <br />$ 111,76 <br />7 <br />Interconnect Cabfe (6 pair) <br />L, F. <br />3360 <br />$3.50 <br />$ 100.00 <br />,- <br />$1,700.00 <br />8 <br />Install Pull Box #3►� <br />17 <br />9 <br />$ 100.00 <br />$900.00 <br />9 <br />Install Pull Box 0 5 <br />Ea, <br />t <br />$8,000.00 <br />$8,000.00 <br />10 <br />Install Model 170 Controller <br />Ea. <br />4 <br />$6,000.00 <br />524,000.00 <br />1I <br />install 170 Cabinet <br />Ea. <br />Ea. <br />1 <br />$8,000.00 <br />$8,000.00 <br />12 <br />Install 170 Local Controller <br />1 <br />$2,000.00 <br />S2,000.00 <br />13 <br />Install 404 Modem <br />Ea. <br />L, F. <br />a3j5 <br />$13.3V <br />536, 125.00 <br />lel <br />Install interconnect conduit <br />l z <br />$750.00 <br />$9,000.00 <br />15 <br />Install Tragic Detector Loop <br />Ea. <br />a <br />$ 1,500.00 <br />$6,000.00 <br />' 16 <br />PRV Signal Head <br />Ea. <br />4 <br />$500.00 <br />$2,000.00 <br />17 <br />Standard Signal Hcad <br />Ea <br />L.S. <br />1 <br />$23,700.00 <br />$23,700.00 <br />18 <br />Valley & 9th Signal Imprv. <br />L.S. <br />1 <br />$42,300.00 <br />$42,300.00 <br />19 <br />La CadcnaNallcy Signal lm <br />L.S <br />1 <br />$10,500.00 <br />$10,500.00 <br />20 <br />La Cadena/Bordwcll Imprv. <br />Subtotal Contract Items <br />Supplemental Work <br />Agcncy/State Furnished Materials <br />Striping <br />Total <br />Contingencies <br />Contract Total <br />Construction Engineering <br />TOTAL COST: <br />Pape 1 <br />$273,085.00 <br />$0.00 <br />$0.00 <br />$0,00 <br />$273,085.00 <br />$27,309.00 <br />$300,394.00 <br />$37,606.00 <br />$338,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.