Laserfiche WebLink
CITY OF COLTON <br />CITY COUNCIL AGENDA REPORT <br />For City Council Meeting of May 5, 1998 <br />TO: Honorable Mayor and City Coun it Members <br />APPROVAL: Henry T. Garcia, City Manager <br />FROM: Thomas K. Clarke, Utility Director <br />SUBJECT: Set For Public Hearing the Adoption of an Ordinance Approving a Sewer Rate <br />Increase <br />DATE: Apri128, 1998 <br />BACKGROUND <br />Every five years the Wastewater Division is to conduct a Wastewater Master Plan which evaluates the <br />current condition of the sewer system and makes recommendations regarding repairs and upgrades of <br />the existing facilities and projects the needs of new infrastructure based upon finite growth assumptions. <br />From this document, a Capital Improvement Program (CIP) can be developed so that the sewer system <br />can continue to provide safe, reliable, and economical service to the community. <br />Two years ago, a rate increase was approved that went into effect in July, 1996. At the time of that <br />approval, the financial plan indicated a second rate increase to be effective in July of the current year. <br />That increase was projected in the 8 to 9 percent range. At the time of the discussion pertaining to the <br />increase, only the Wastewater Treatment Plant expansion was factored in to the rate scenario. Some <br />accommodation was made for an on-going CIP. However, none of the specific recommendations were <br />available. Therefore, the current rate request includes the consultant's findings, the input from the <br />Utilities Commission workshop, and the revised financing scenario that is reflective of the State <br />Revolving Fund loan. <br />DISCUSSION ! ANALYSIS <br />Kennedy and Jenks has completed the Master Plan and submitted the final document to the Utility <br />Department for consideration and action. The Utilities Commission reviewed the plan and the proposed <br />CIP. They have determined that there is approximately $13,851,200 of system improvements required to <br />bring the wastewater system up to the necessary standards to provide reliable service. These <br />improvements are apportioned to both the existing system as well as that required to accommodate <br />future growth. It is staff's recommendation to concentrate more on system rehabilitation and existing <br />repairs in the short-term, and plan for growth as it occurs in the future. This will obviously place more <br />emphasis on upgrading the older sections of the City first, and recognize that the newer sections have <br />relatively new and adequate sewage collection infrastructure. <br />It should be clearly noted that the recommendations and subsequent work on the system do not include <br />the repairs and expansion at the Wastewater Treatment Plant. That work has been authorized and <br />designed in a separate action outside the scope of the Wastewater Master Plan. It should be <br />emphasized, though, that the financial impacts of the change from a revenue bond (envisioned in the <br />plan developed two years ago) to the funding from the State Revolving Fund have been factored into the <br />new financial plan. This does result in a change to the anticipated rate increase in an upward fashion. <br />Itm # 22 <br />