My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1998 AGN NOV 17 I15
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1998
>
1998 November 17 Agenda Packet
>
1998 AGN NOV 17 I15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 11:23:37 AM
Creation date
2/20/2014 2:16:42 PM
Metadata
Fields
Template:
General Documents
Created By
cityclerk
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF COLTON <br />AGENDA REPORT <br />For the Council Meeting of November 17, 1998 <br />TO: HONORABLE MAYOR AND CITY gWN41L <br />APPROVAL: HENRY T. GARCIA, CITY MANAGE <br />FROM: THOMAS K. CLARKE, UTILITY DIRECTOR—J-• � <br />SUBJECT: APPROVAL OF CHANGE ORDER NO. 1 IN THE AMOUNT <br />NOT -TO -EXCEED $31,000 FOR THE JOHN MATICH DRIVE <br />TRENCH REPAIR PROJECT <br />DATE: NOVEMBER 5, 1998 <br />BACKGROUND: <br />On October 6, 1998, Council awarded a construction contract to Vance Corporation in <br />the amount of $97,870 for the trench repair project on John Matich Drive. <br />DISCUSSION/ANALYSIS: <br />Vance Corporation has removed the existing pavement on John Matich Drive, and the <br />City's Inspector along with the Consulting Engineer are now recommending the <br />following: 1) Each of the water line services be replaced; 2) The service trenches be <br />filled with slurry to prevent any future undermining of the water lines by underground <br />water flows. The engineer's cost estimate for this work is not -to -exceed $31,000. <br />Without this added protection to the water lines, it is probable that they will be damaged <br />during the next EI Nino weather event. <br />FINANCIAL IMPACT: <br />Sufficient funds have been budgeted in the Water Line Replacement Capital <br />Improvement, Account Number 521-8100-8106-3890. <br />RECOMMENDATION: <br />Staff recommends that Council approve change order no. 1 in the amount not -to - <br />exceed $31,000 to Vance Corporation for the trench repair on John Matich Drive. <br />Report Prepared By: Lorraine June <br />Item # 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.