My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2001 AGN DEC 04 I14
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2001
>
2001 December 04 Agenda Packet
>
2001 AGN DEC 04 I14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 10:44:06 PM
Creation date
2/20/2014 1:32:21 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
Agendas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN BERNARDINO ASSOCIATED GOVERNMENTS <br />REGIONAL TRANSPORTATION IMPROVEMENT PROGRAM <br />SUBMITTAL FORM <br />FOR <br />2001/2002 TO 2007/2008 <br />YEAR $ IN $1000'S <br />2001/2002 <br />• Barton Road at Terrace Avenue, install traffic signal improvements <br />$130 <br />• South Mt. Vernon Avenue, Washington Street to Terrace Road <br />Rehabilitate roadway <br />$250 <br />• Washington Street, Waterman Avenue to Hunts Lane, <br />$130 <br />Widen from 4 lanes to 6 lanes and improve intersection <br />$1,520 <br />• Colton Avenue, from Mt. Vernon to East City limits — <br />$1,340 <br />widen road from 2 lanes to 4 lanes <br />$230 <br />• Mt. Vernon at 1-10 intersection — traffic signalization, revision and <br />coordination and widening intersection to include left turn lane <br />(both directions) <br />$310 <br />2002/2003 <br />• Main Street and Iowa Avenue and approximately 300' north and <br />300' east of each side of street -intersection improvements, curb & <br />gutter, remove bill board, realign to "T" intersection and traffic signal <br />$300 <br />• Hunts Lane at Cooley Lane, install traffic signal improvements. <br />$130 <br />• Fogg Street, a Street to South La Cadena Drive, reconstruct <br />Grade separation, widen for center turn lane. <br />$1,340 <br />• In Colton at Mt. Vernon Avenue, modify interchange <br />$2,127 <br />• Washington Avenue, Reche Canyon Road and Hunts Lane <br />to add additional lane for eastbound and west bound traffic <br />entails reconfiguration of existing raised median and re -striping <br />to fit new configuration of both intersections. <br />$500 <br />• Park and Ride alt. Fuel facility at 1-10 and Sperry <br />to amend for off -ramp at 1-10 and Sperry $2,537 <br />• Pepper Avenue and Valley Blvd. — realign and install <br />street improvements from Pepper Avenue to Hermosa Avenue $780 <br />2004/2005 <br />• Washington Street, Bluff Road to Cooley Drive, widen road and <br />install curb & gutter improvements $420 <br />
The URL can be used to link to this page
Your browser does not support the video tag.