My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2002 AGN SEP 04 I14
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2001
>
2001 September 04 Agenda Packet
>
2002 AGN SEP 04 I14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 11:19:51 AM
Creation date
2/20/2014 1:24:09 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
Agendas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF COLTON <br />AGENDA REPORT <br />For City Council Meeting of September 4, 2001 <br />Item #14 <br />To: Honorable Mayor & City Council <br />From: Ronald C. Kenny, Director of Parks, Recreation & Family Services 121 <br />Subject: Recommendation to Reject All Bids for the Construction of a Child Care Facility at <br />Reche Canyon Elementary School <br />Date: August 27, 2001 <br />BACKGROUND: <br />In 1999, the Colton Community Childcare Division was awarded CDBG funds totaling $130,000. The funds were <br />earmarked for the installation of a replacement facility at Reche Canyon Elementary School. <br />DISCUSSION/ANALYSIS: <br />The installation of a new unit would have allowed the Childcare Division to replace the substandard modular <br />facility currently in use. The proposed facility would have utilized a concrete foundation, constructed on-site, and <br />would have been a permanent structure. It would have included approximately 600 square feet of additional space <br />and would have included restrooms, not available in the modular unit. <br />It was hoped that this type of construction would have provided cost savings versus a pre -constructed modular unit <br />rental. The City Engineer designed the proposed facility. When bids were opened on August 9, all bids were in <br />excess of the $130,000 approved for the project. <br />FINANCIAL IMPACT: <br />The City received four bids: <br />Cogley & Son, General Contractors $251,270 <br />Corona Contractors 258,425 <br />J.P. La Barge Construction Mgmt. 296,666 <br />Paul D. Wilson 317,288 <br />RECOMMENDATION: <br />Staff recommends that all bids, for the construction of a permanent Childcare replacement facility at Reche Canyon <br />Elementary School, be rejected as each bid exceeded the budget for the project. <br />REVIEW TEAM ONLY <br />City Attorney: Z�' Finance Director:i z¢� <br />City Manager: OTHER: <br />
The URL can be used to link to this page
Your browser does not support the video tag.