Laserfiche WebLink
EXHIBIT "C "� <br />FEE PR4POSAL <br />The total cost to comptete a!i tasks in ihe scope af wark outiined �n Sec#�an 2.0 are presented in Table �-1 <br />and Table 6-2. Table 6-1 presents #he taiai cos# by projec� if each project resulted in #he preparatian o� a. <br />Negative QecJaration. Tab�e 6-2 presents the totaE cost by project if the Public Access 24-Hour <br />Altemative Fueling Station Park and Ride Faciii#y pro�ec# resuited in a Focused Enviranmental impact <br />Report �E�R}, and all other projects resc�fted in a Mitigated Negati�e Declaration �MND}, Addi#�ona1 war�c <br />wi11 be perfarmed on a i�me-and-rr�ater�als basis using the rates in Table �-3. if an additiona! traffic study <br />is requ�red, HernandeZ, Kroone & Associates wi�i perform th�s wo�#c. A separate scope of work and cost <br />estirnate far any traffc study wilf be pre�ared using the rates 'rn Tabte 6-4. <br />� <br />. <br />Table s-1 � <br />Fee Schedu�e <br />S ummary by Project , <br />Atl pro�ects Resulting in iUl�tigated Negative Qeciaratio� <br />Tab le 6-2 <br />Fee Schedule <br />Summary by Project <br />Park and Ride Project Resulting in E�R <br />All Other Projects Resufting in Mitigated Negat=ve �3ec�aration <br />OZ-119 <br />�arlooz 1 <br />