My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2002 AGN DEC 03 I19
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2002
>
2002 December 03 Agenda Packet
>
2002 AGN DEC 03 I19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 10:41:19 PM
Creation date
2/20/2014 1:17:57 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
Agendas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DATE: September 11, 2002 <br />FROM: AMER JAKHER, P.E., CITY ENGINEER <br />CITY OF COLTON <br />TO: SIERRA PACIFIC ELECTRICAL CONTRACTING <br />2542 AVALON STREET <br />RIVERSIDE, CA 92509 <br />ENGINEERING DEPARTMENT <br />CHANGE ORDER #1 <br />TRAFFIC SIGNALIZATION PROJECT: RECHE CANYON ROAD/TOPANGA WAY, <br />RECHE CANYON ROAD/SHANE DRIVE & HUNTS LANE/COOLEY LANE <br />INSTRUCTIONS TO THE CONTRACTOR AT THE REQUEST OF THE CITY ENGINEER: <br />- At Reche Canyon Rd./Topanga Way: install electrical handhole and <br />intercept existing Colton Power 2" line. Put additional width on sidewalk <br />to meet ADA requirement. <br />- At Reche Canyon Rd./Shane Drive: Modify signal poles to meet power <br />line clearance requirement (10 ft. as per plan) <br />I. INCREASE QUANTITY: <br />No Item # Install elect. Handhole and intercept Lumpsum = 1,673.00 <br />2" existing power line <br />No Item # Modify signal pole 2 Ea. @ $950.00 Ea.= 1,900.00 <br />No Item # 4" concrete for sidewalk Lumpsum - 200.00 <br />TOTAL AMOUNT FOR CHANGE ORDER #1 = $ 3,773.00 <br />It. CONTRACT AMOUNT RECONCILLATION: <br />ORIGINAL AMOUNT OF CONTRACT <br />END OF CHANGE ORDER #1 <br />= $ 279,152.00 <br />AS PER CHANGE ORDER # 1 = $ <br />CHANGE ORDER #1 IS HEREBY ACCEPTED AND AGREED UPON. <br />AMER JAKHER, P. E., CITY ENGINEER <br />DARYL PARRISH, CITY MANAGER <br />DATE <br />DATE <br />SIERRA PACIFIC ELECTRICAL CONTRACTING DATE <br />\\Cfs 0MUsmWictor Oniz\3 Traffic Signal Project\Change Order\CHANGE ORDER #l.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.