My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2002 AGN JAN 15 I21
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2002
>
2002 January 15 Agenda Packet
>
2002 AGN JAN 15 I21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 12:53:13 PM
Creation date
2/20/2014 1:22:55 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
Agendas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
$2,603.00. In November, 2001 I was also required by City Works to sign a letter of conditions <br />requiring me to install a handicap ramp in the corner sidewalk adjacent to my property, and plant <br />four trees in the right of way adjacent to my property. City Works also informed me verbally that <br />there is a $60.00 handicap ramp permit fee (my cost to have a contractor install this ramp will be <br />$1500.00). This "new" fee still has not shown up anywhere in writing. One last fee that I still have <br />not been quoted is for the permit to tear down, transport, and set up my manufactured home. <br />Maybe it has been included in the alphabet soup of fees that I have been presented, but if it has <br />not yet been included; I wander how much more that will cost. Furthermore, I wander if any other <br />fees will crop up once all the permits are paid and the work is under way. <br />When I assessed all the information that I was originally given in writing, I expected to pay <br />approximately $4245.00 in fees (including the School Fees). The actual tally came in at <br />$10, 928.00, that is a difference to my deficit of $6683.00. Not counting School Fees or <br />additional contractor work, the difference in fees are as follows: <br />Building Fees <br />March, 2001 <br />743.00 <br />Building Fees <br />November, 2001 <br />743.00 <br />Plan Check <br />220.00 <br />Plan Check <br />220.00 <br />Desip Review <br />330.00 <br />Design Review <br />330.00 <br />Additional Fees <br />2663.00 <br />Total <br />1293.00 <br />Total <br />3956.00 <br />Mr. Parrish, in all fairness I respectfully request you to encourage the City Council to relieve my <br />wife and I of the financial burden of the additional fees and the requirement to install a handicap <br />ramp in the sidewalk. Furthermore I request some assurance that whatever we are ultimately <br />assessed, it will cover everything that we need to complete our project. My wife and I have <br />worked very hard to bring our dream of owning our own property to fruition. Our oldest <br />daughter is developmentally delayed, and at this time I am not working because we cannot get <br />daycare for her. Accurate information is vital to our finacial survival. We did everything possible <br />to obtain accurate information, however through no fault of our own we recived inaccurate and <br />incomplete information. Anything the City Council can do to assist us will greatly be appreciated. <br />Sincerely Your <br />SebasDiaz— <br />STD/std <br />tian T. Diaz <br />STD/std <br />
The URL can be used to link to this page
Your browser does not support the video tag.