My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2002 AGN MAY 07 I14
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2002
>
2002 May 07 Agenda Packet
>
2002 AGN MAY 07 I14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2014 3:29:10 PM
Creation date
2/20/2014 1:20:15 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
Agendas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I�em #'7 a <br />CITY OF COLTON <br />AGENDA REPORT <br />FOR THE CITY COUNCIL MEETING OF MAY 7, 2002 <br />TO: HONORABLE MAYOR AND CTTY COUNCIL MEMBERS <br />FROM: AMER JAKHF.I� P.E., CITY ENGINEER ��S� <br />gUgJECi'; APPROVE TEIE AWARD OF CONTRACT FOR ARCHITECTURAL <br />DESIGN SERVICES FOR TF� BIG LEAGUE DREAMS SPORT PARK <br />TO PURKISS-ROSE-RSI IN TE� AMOLINT OF $381,325.00. <br />DATE: APRIL. 22, 2002 <br />BACKGROUND: <br />The Big I.,eague Dreams Sports Complex is a 16-acre pazk project, consisting of three replica baseball <br />stadiums, one multi-sport pavilion, fow sand volleyball courts, one skateboazd arena, one stadium <br />club/concessionaire, two tot lots and a 300 stall parking lot. This project is located eastedy of Meridian <br />and northerly of Valley Blvd. (See aztached Fachibit "A", a copy of the site plan.) <br />On August 21, 2001, the City Council approved agreements with Big Iza�ue Dreams for constnrction <br />and management of a community sports pazk. As part of the Design Developmeat for this project, <br />Professional Arctritectural Services would be required. On April 17, 2002 a Request for Proposal was <br />sc,mt out to Architectural Firms. Staff received formal proposals from (2) two of the Architectural <br />Firms: <br />Purkiss-rose-rsi from Fullerton, Califomia <br />Hirsch & Associates from Anaheim, Califomia <br />The scope of work consists of (SZphases of work: <br />Phase I — Project Layout <br />Phase II— Schematic Site Plan Design <br />Phase III — Construction Documents <br />Phase IV — Bid Administration <br />Phase V— Consttvction Observation and Administration <br />(Ses attached Fxhibit "B", a copy ofthe proposal from Purkiss-rose-rsi). <br />ANALYSIS/DISCUSSION: <br />Staff has evaluated proposals and has determine that Purkiss—rose—rsi, of Fullerton, Califomie best <br />meets the qualifications for this work, in accordance with applicable law. <br />
The URL can be used to link to this page
Your browser does not support the video tag.