Laserfiche WebLink
CITY OF COLTON <br />BID ANALYSIS <br />VARIOUS TRANSFORMERS <br />BID DATE: 5/7/02 <br />SOUTHWEST POWER <br />WESCO UTILITY <br />Santa Fe, rines CA <br />Santa Fe S rim s CA <br />UNIT <br />AMOUNT <br />UNIT <br />AMOUNT <br />ITEM A <br />QTY <br />DESCRIPTION <br />PRICE <br />PRICE <br />1 <br />2 <br />150 kva Normal profile padmount transformer(s), radial <br />$4,532.99 <br />$9,768.59 <br />$4,051.00 <br />$8,729.91 <br />feed, 12470 Delta primary voltage with external taps (two <br />over, two under). Elastimold bushing wells, on/off primary <br />loadbreak switch and dual sensing bay -o -net fuses. Secondary <br />voltage to be 240 Delta/120V MIDTAP, three phase with <br />Nema Spade termnation. Transformer enclosure to be in <br />accordance with the Western Underground Committer <br />Requirements. Per City of Colton Specifications. <br />Delivery: <br />7 Weeks <br />8 Weeks <br />Manufacturer: <br />General Electric <br />ABB <br />2 <br />1 <br />150 KVA Normal profile padmount transformer(s), radial <br />$4,852.58 <br />$5,228.65 <br />$4,243.00 <br />$4,571.93 <br />feed, 12470 Delta primary voltage with external taps (two <br />over, two under). Elastimold bushing wells, on/off primary <br />loadbreak switch and dual sensing bay -o -net fuses. Secondary <br />voltage to be 480Y/277, three phase with Nema Spade <br />termination. Transformer enclosure to be in accordance <br />with the Western Underground Committee Requirements. <br />Per City of Colton Specifications. <br />Delivery: <br />7 Weeks <br />8 Weeks <br />Manufacturer: <br />General Electric <br />ABB <br />3 <br />1 <br />75 KVA Norval profile padmount transforrner(s), radial <br />$4,081.44 <br />$4,397.75 <br />$3,942.00 <br />$4,247.51 <br />feed, 12470 Delta primary voltage with external taps, (two <br />over, two wider). Elastimold bushing wells, on/off primary <br />loadbreak switch and dual sensing bay -o -net fuses. Secondary <br />voltage to be 480Y/277, three phase with Nerna Spade <br />termination. Transformer enclosure to be in accordance <br />with the Western Underground Committee Requirements. <br />Per City of Colton Specifications. <br />Delivery: <br />7 Weeks <br />8 Weeks <br />Manufacturer: <br />General Electric <br />ABB <br />TOTAL OF AWARD: <br />$17,549.25 <br />